Renovation Begins at Maryland High School

The S/L/A/M Collaborative (SLAM), a Glastonbury, Conn.-based national architecture firm, completed programming, design, and documentation for the 27,800-square-foot renovation and addition of the Five Arts & Student Center at St. Timothy’s School, a private all-girls high school established in 1882. The project broke ground on in February of 2018, and construction is estimated to be completed in December 2018. SLAM is also providing structural engineering, landscape architecture, and cost estimating services.

St. Timothy's School

“We are pleased to partner with St. Timothy’s in this important enhancement project that will provide students, faculty and staff with a quality arts, academic and student activity space on campus that matches the high-quality educational experience currently afforded students,” says Richard Connell, FAIA, SLAM principal-in-charge. “The space transformation will also benefit the public through a new art gallery space, where art by students, the community, and visiting artists will be exhibited.”

The former, two-story Hannah More Arts Center, now named the Five Arts & Student Center, home to programs in literature, theatre, dance, visual arts and music, will undergo a renovation including a new contemporary façade and an additional floor to the structure.  Other significant upgrades to the facility will include a refurbished 320-seat theater featuring new seats, lighting and A/V, a full-service Health and Wellness Center, additional classroom space for the English Department, and an expanded 1,000 square-foot Art Gallery. The courtyard located between the Five Arts & Student Center and dining facility will be redesigned with new ornamental trees, benches and new pavers, creating a more welcoming space to relax in between classes in the outdoors.

SLAM’s previous work on campus includes the design of The Commons and Redland Café and Dixon Hall, the main Academic Building.

Featured

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition