Renovation Begins at Maryland High School

The S/L/A/M Collaborative (SLAM), a Glastonbury, Conn.-based national architecture firm, completed programming, design, and documentation for the 27,800-square-foot renovation and addition of the Five Arts & Student Center at St. Timothy’s School, a private all-girls high school established in 1882. The project broke ground on in February of 2018, and construction is estimated to be completed in December 2018. SLAM is also providing structural engineering, landscape architecture, and cost estimating services.

St. Timothy's School

“We are pleased to partner with St. Timothy’s in this important enhancement project that will provide students, faculty and staff with a quality arts, academic and student activity space on campus that matches the high-quality educational experience currently afforded students,” says Richard Connell, FAIA, SLAM principal-in-charge. “The space transformation will also benefit the public through a new art gallery space, where art by students, the community, and visiting artists will be exhibited.”

The former, two-story Hannah More Arts Center, now named the Five Arts & Student Center, home to programs in literature, theatre, dance, visual arts and music, will undergo a renovation including a new contemporary façade and an additional floor to the structure.  Other significant upgrades to the facility will include a refurbished 320-seat theater featuring new seats, lighting and A/V, a full-service Health and Wellness Center, additional classroom space for the English Department, and an expanded 1,000 square-foot Art Gallery. The courtyard located between the Five Arts & Student Center and dining facility will be redesigned with new ornamental trees, benches and new pavers, creating a more welcoming space to relax in between classes in the outdoors.

SLAM’s previous work on campus includes the design of The Commons and Redland Café and Dixon Hall, the main Academic Building.

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • Delta State University Completes Renovations to School of Nursing Facilities

    Delta State University recently completed a major expansion and renovation project for the Robert E. Smith School of Nursing facilities on its campus in Cleveland, Miss., according to a news release. The project includes about 14,000 square feet of new construction and more than 21,000 square feet of renovation work to the existing space.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

Digital Edition