New High School Planned in Los Angeles

Amino School Los AngelesOn July 22, 2014 a massive fire broke out and destroyed half of the Animo South Los Angeles High School campus. Located in one of the toughest areas in South Central Los Angeles, an area that was a central trouble spot during the 1964 Watts and the 1992 Rodney King Riots, residents’ median family income is less than $35,000/year and 25-percent of the population lives below the poverty level. Green Dot Public Schools is replacing the burned school with a new public charter high school for 630 students that is visually open but entirely secured.

The replacement building contains 11 classrooms, two science labs, a faculty lounge, new administrative and counseling offices, and public courtyard space for student gatherings and activities.

Designed on an extremely limited budget and aggressive schedule, simple cost-effective gestures were deployed in the use of cladding, fenestration, color and transparency to create a memorable sense of richness, providing a bright moment in an extremely tough inner-city community. Unlike most school that are enclosed by a property line security fence, the South Los Angeles High School building is surrounded by a 20-foot-high perforated bullet resistant metal walls that are integrated into the building design. The project architectural firm is Brooks + Scarpa. Learn more at www.brooksscarpa.com.

Featured

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.