Free Booklets Available On Classroom Acoustics

According to classroom acoustics, a publication of the technical committee on architectural acoustics of the Acoustical Society of America (ASA), speech intelligibility among listeners with normal hearing is about 75 percent or less in many of today’s classrooms. This means that listeners miss one out of four words read to them off a list. Adults and older children can use their experience to “fill in the gaps” and make sense of what’s being said. Younger children who are just exploring language, ESL students, the learning disabled, and the hard of hearing do not have that luxury.

That number of hard-of-hearing students is remarkably large and flexible. The Centers for Disease Control and Prevention estimates that up to 15 percent of school-age children suffer from temporary hearing loss at any time. Allergies, ear infections, and colds or other forms of congestion mean that today’s competent hearer could be tomorrow’s hard-of-hearing student.

The good news is that making classrooms acoustically sound is neither difficult nor expensive. A bit of forethought, a small upgrade in materials, and acoustical enhancement is all it takes to make classrooms and other core learning spaces better. “The best way to solve acoustics problems is to prevent them beforehand, not correct them after the fact,” continues the publication. “Renovation of poorly designed classrooms is much more expensive.”

Thankfully, more and more states are implementing ANSI/ASA S12.60-2002, Acoustical Performance Criteria, Design Requirements and Guidelines for Schools. Consistent with long-standing recommendations for good practice in educational settings, the new standard sets maximum limits for background noise (35 decibels) and reverberation time (0.6 to 0.7 seconds) for unoccupied classrooms.

To help architects, planners create learning spaces that meet the guidelines, the ASA has published three booklets on Classroom Acoustics topics that can be downloaded for free on their website, www.acousticalsociety.org/classroom-acoustics.

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

Digital Edition