How Rubber Flooring Impacts Life-Cycle Costs

The demands placed on flooring in educational facilities are significant. Steady foot traffic and heavy rolling loads can quickly compromise a floor’s original beauty and integrity. With increasing pressure to lower operational expenses, many learning institutions are turning to Life-Cycle Cost Analysis (LCCA) to determine which flooring material offers the greatest durability and resilience, and how that directly translates to value and cost savings. Rubber flooring has proven to be a leader in this category. Here’s why:

  • Installation
    Rubber flooring with a self-adhesive backing can be installed directly over an existing floor. It has fewer seams with less cutting and joint sealing, resulting in faster turn-times reducing your timeline by up to half.
  • Durability
    The extremely dense surface of rubber flooring can withstand the pressure of heavy loads and is highly resistant to liquid spills and harsh chemicals.
  • Maintenance
    Flooring maintenance can account for 75 to 90 percent of total cost over the product’s projected lifespan. Premium rubber flooring has a nonporous surface that inherently repels stains and can be cleaned with little more than water. Unlike other resilient flooring, rubber’s uncoated surface means the floor never needs to be stripped and resealed.
  • Sustainability
    Rubber flooring is naturally sourced and has a low-VOC rating, contributing to a healthier environment and improved indoor air quality (IAQ) for students and staff alike.

Premium rubber flooring has significant impact on total cost of ownership. Using LCCA during flooring specification helps schools lower expenses long-term while increasing the health and safety of students, faculty, and staff.

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at [email protected] or 800-332/NORA.

Featured

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.