How Rubber Flooring Impacts Life-Cycle Costs

The demands placed on flooring in educational facilities are significant. Steady foot traffic and heavy rolling loads can quickly compromise a floor’s original beauty and integrity. With increasing pressure to lower operational expenses, many learning institutions are turning to Life-Cycle Cost Analysis (LCCA) to determine which flooring material offers the greatest durability and resilience, and how that directly translates to value and cost savings. Rubber flooring has proven to be a leader in this category. Here’s why:

  • Installation
    Rubber flooring with a self-adhesive backing can be installed directly over an existing floor. It has fewer seams with less cutting and joint sealing, resulting in faster turn-times reducing your timeline by up to half.
  • Durability
    The extremely dense surface of rubber flooring can withstand the pressure of heavy loads and is highly resistant to liquid spills and harsh chemicals.
  • Maintenance
    Flooring maintenance can account for 75 to 90 percent of total cost over the product’s projected lifespan. Premium rubber flooring has a nonporous surface that inherently repels stains and can be cleaned with little more than water. Unlike other resilient flooring, rubber’s uncoated surface means the floor never needs to be stripped and resealed.
  • Sustainability
    Rubber flooring is naturally sourced and has a low-VOC rating, contributing to a healthier environment and improved indoor air quality (IAQ) for students and staff alike.

Premium rubber flooring has significant impact on total cost of ownership. Using LCCA during flooring specification helps schools lower expenses long-term while increasing the health and safety of students, faculty, and staff.

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at [email protected] or 800-332/NORA.

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • AAADM Announces Building Safety Month Initiatives

    The American Association of Automatic Door Manufacturers (AAADM) recently announced its support of Building Safety Month as declared by the International Code Council (ICC), according to a news release.

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.