Student Union Opened at Rose-Hulman Institute of Technology

The Mussallem Union project at Rose-Hulman Institute of Technology in Terre Haute, IN, was recently completed, and opened to the student community for the first time. The feature-rich facility serves as a place for students to socialize, study, and relax.

Some of the spaces in the Mussallem Union include a coffee/smoothie bar, a café, an outdoor patio, conference rooms, and the Office of Career Services. Aside from being a gathering place for students, the Mussallem also acts as a campus welcome center for visitors to the school. The project, which began in 2016, is named after project donors Linda and Rose-Hulman graduate Mike Mussallem.

Mussallem Union

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.