Dedication Ceremony Held for New HISD Energy Institute High School

On September 19th, Houston ISD and VLK Architects celebrated the dedication of the new Energy Institute High School. The ceremony was held at the new campus on Southmore Boulevard in the heart of Houston’s Third Ward where students, staff, administration, and community members gathered for a unique board cutting ceremony.

Houston ISD

The new school is home to Houston ISD’s magnet program, specializing in project-based learning centered on the energy industry. This new campus, established in the “Energy Capital of the World,” is helping the district pave the way for industry ready students well versed in corporate culture. The school spans 116,000 square feet and has capacity for 813 students in grades 9-12. Comprised of three buildings that converge at a covered outdoor learning courtyard, the campus design is reflective of industry culture that supports collaborative learning. Each building is comprised with educational environments for individualized focused learning, flexible collaboration, and hands-on CTE lab experiences. 

“Our partnership with everyone at VLK was so genuinely successful because of their ability to advocate for our teachers and our students every step of the way,” said Energy Institute Principal, Lori Lambropoulos. For more information, visit www.vlkarchitects.com.

Featured

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.