New Athletic Performance Center at St. Mark’s School Completed

Southborough, Mass. – Students returned from summer vacation to find a brand new athletic performance center at St. Mark’s School, ready for full use for the fall season.  Revitalized by Erland Construction and S3 Design, the state-of-the-art T. Jefferson Coolidge, Jr. ’50 Athletic Performance and Wellness Center is designed to support students’ academic success through fitness and conditioning.  

St. Mark's

Located inside Elkins on campus, the 4,000-square-foot Coolidge Center has nearly doubled the size of St. Mark’s athletic space and includes top-quality recreation equipment, space for free weights, floor pads for safe strength training, and new cardiovascular machines. The Center also provides office space and additional storage for the school’s Athletics Department, including amenities such as a laundry service for team uniforms.

“Our team felt great satisfaction in repurposing and revitalizing this underutilized space within the circa 1930s Field House to create a popular destination for St. Mark’s athletes to train,” said Scott Bates, V.P., Academic, Corporate and Commercial Group Manager.  “We’re proud to have partnered with S3 Design and St. Mark’s to support the school’s growing athletic and wellness needs and to finish the project on time in three months for the start of the school year.” 

The renovation of the Coolidge Center also included updating the sprinkler system, upgrading MEP systems, and enclosing two open-air walkways adjacent to the main lobby.

Over the past 41 years, Erland Construction has successfully grown into the Northeast’s leading open shop construction management and general contracting firm. The Company is headquartered in Burlington, Massachusetts and has specialized expertise for new construction, additions, and renovations in major market sectors including academic, residential, corporate, advanced technology/life sciences, commercial, senior living and hospitality. For more information, visit www.erland.com.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.