College of the Atlantic Plans New $13M Academic Building

This spring, groundbreaking will take place on the campus of the College of the Atlantic in Bar Harbor, ME, on a new $13-million, energy-efficient Center for Human Ecology building that will house science laboratories, lecture halls, faculty offices, art and design studios, and a teaching greenhouse.

College of the Atlantic

The two-story, 29,000-square-foot building will be built to exacting energy standards, reducing energy usage by 80 percent compared to a similar building with more traditional construction designs and materials.

The architects for the project are Susan T. Rodriguez of New York City and GO Logic of Belfast, Maine. E.L. Shea, Inc. of Ellsworth is expected to lead construction of the building, which is expected to be completed by September 2020.

Featured

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.