In Letter to States Education Executives, Eneref Institute Implores Schools to Include Interior Daylight in Classroom Lighting

Philadelphia – As part of the Eneref Institute #WellnessFriendlySchools Campaign, Eneref sent a letter to all 50 state education executives, urging them to act on the findings of a recent Eneref Report on classroom lighting. The Eneref Report examined the biological impact of Natural Interior Daylight in classrooms on improved student performance.  

Link to campaign: https://eneref.org/impact/wellnessfriendlyschools/

Eneref has reached out to school executives in order to place this report in the hands of authorities responsible for student performance. The bottom line of the Eneref Report is this: The right daylight in classrooms alone can improve student test scores.

Eneref Institute is a research and advocacy organization for sustainable development. The Eneref campaign aims to achieve a healthy school environment through an earth-friendly and wellness-friendly approach to building schools. 

As presented in the letter to school executives, the Eneref Report’s key conclusions describe:

  • A high correlation between schools that reported improvements in student test scores and those that reported greater amounts of daylight in the classroom.
  • A possible disruption of the molecular clocks that regulate the temporal dynamics of cellular activities caused by poorly designed artificial electric lighting.
  • The importance of illuminating schools with natural daylight to help students’ bodies regulate melatonin, reinforcing circadian wellness and improving performance. ­

The Eneref Report, titled “Classrooms Optimized with Natural Daylight Increase Student Performance,” can be downloaded here: http://bit.ly/eneref-skylightled.

As the Eneref Report states, careful architectural planning and utilization of daylight to illuminate rooms, in conjunction with LED electrical lighting, is not only efficient for buildings but also healthy for occupants, both students and faculty alike.

 

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition