Middlesex Community College: Richard and Nancy Donahue Family Academic Arts Center

middlesex community college

PHOTOS © ROBERT BENSON PHOTOGRAPHY

The design by Leers Weinzapfel Associates of this new academic arts center reimagines the historic Boston & Maine Railroad Depot at Towers Corner within the Lowell National Historical Park in Massachusetts. Located in an urban core, the building’s 1876 exterior was preserved, while the interior was completely reconstructed, nearly doubling space for the college’s growing performing arts departments of music, theater, and dance.

The project comprises three major teaching spaces; a new proscenium theater classroom, a music recital hall, and a dance studio black box theater, each delivering a professional-level technological environment with the intimate scale appropriate for student performance. The largest of these spaces, a central oval structural volume, supports the building’s 240-year-old walls and houses a unique 177-seat “egg theater.” The theater steps down from the ground floor lobby to a basement level, affording excellent sight lines and fully accessible space for students, performers, and patrons.

At the second floor, the recital hall and dance studio take advantage of the building’s high roof, exposed timber trusses, and borrowed light through a west-facing gallery passageway. Along the sidewalk, a linear gallery and theater lobby display student activity and invite the public in through a main entry at the base of the Center’s landmark clock tower.

An addition at the rear of the building, constructed in a 20-foot zone purchased by the owner, comprises mechanical and building support space that provides sound separation for the performance venues. Excavation created space for a full basement that was required for accessibility.

Building reuse not only achieves the goals of historic preservation for the Center, it also contributes to its sustainability. The depot’s elegant façade was carefully repointed and supported from behind by the reinforced foundation and by the sturdy egg-shaped theater volume. Highly insulated walls and efficient systems contribute to the building’s energy efficiency.

This article originally appeared in the College Planning & Management April/May 2019 issue of Spaces4Learning.

Featured

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.