New Jersey SDA Requiring Certification for Flooring to Protect Against Mercury

Following the discovery this spring of mercury vapors emanating from the floors of several school buildings in New Jersey, the state will begin requiring mercury-free certification for all flooring installed in schools.

The information was released by New Jersey Education Association (NJEA), announcing that the New Jersey Schools Development Authority (NJSDA) would be implementing the requirement.

According to NJEA: “The New Jersey Schools Development Authority (SDA) will be requiring a certification from manufacturers of rubberized and/or urethane floors installed on SDA projects ensuring the floor does not contain phenyl mercuric acetate (PMA) or other mercury catalysts. These floors, which continue to be identified in New Jersey schools, have been installed since the 1960s. This flooring, and items that have been in contact with it, emit harmful mercury vapor indefinitely.”

As of this writing, NJSDA has posted no information about this new requirement on its own site.

However, an addendum to a specific recent bid document did add the requirement for “written certifications from both manufacturer and installer that floor system and accessories, including without limitation resilient sheet, poured topcoat, color coat, and all catalysts and adhesives are 100% free of mercury and other heavy metals,” as well as the requirement to “coordinate with the Authority’s Construction Manager for on-site sampling and testing of materials prior to application.”

“Mercury vapor can damage the central nervous system, kidneys, lungs, skin and eyes and is especially harmful to young children and fetuses whose bodies are still developing. Studies show that children with autism have an even harder time excreting toxic metals, further increasing the health risk,” according to NJEA. “The additional certification from manufacturers is necessary as Safety Data Sheets and date of installation are not determining factors in identifying whether or not a floor contains mercury. The floors release odorless, colorless mercury vapor. The only reliable way to determine whether a floor contains mercury is to test using bulk sampling and an accredited laboratory.”

Further information can be found on NJEA’s site.

About the Author

David Nagel is the former editorial director of 1105 Media's Education Group and editor-in-chief of THE Journal, STEAM Universe, and Spaces4Learning. A 30-year publishing veteran, Nagel has led or contributed to dozens of technology, art, marketing, media, and business publications.

He can be reached at [email protected]. You can also connect with him on LinkedIn at https://www.linkedin.com/in/davidrnagel/ .


Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.