Michigan High School Designed to Protect Students from Mass Shootings

With the high frequency of mass shootings in the United States, Fruitport School District administrators had campus safety on their mind when designing new sections of Fruitport High School in Michigan. The $48 million project will include curved hallways and extra layers of protection for students, teachers and staff in the event of a shooting.  

Construction for the high school is ongoing and include major renovations to the existing building and adding new sections with safety features. The curved hallways reduce the range of an active shooter — meaning they won’t be able to see the entire length of the hallway. Cement blocks jutting out along the hallway provide cover to students and allow them to seek refuge within a classroom.

“If I go to FPH and I want to be an active shooter, I’m going in knowing I have reduced sightlines,” Fruitport Superintendent Bob Szymoniak told the Washington Post. “It has reduced his ability to do harm.”

Inside the classrooms, students are able to hide along a side wall known as the “shadow zone,” where they can’t be seen by a gunman from the hallway.

Inside the classrooms, students are able to hide along a side wall known as the “shadow zone,” where they can’t be seen by a gunman from the hallway. Impact resistant film will go on all classroom windows in the new high school. The school plans to implement access control locks in every classroom which gives school leaders the ability to lock down the entire school with the push of a button.

By adding layers of safety it will buy students, teachers and staff time as police respond to the scene, Szymoniak told a local news station.

Matt Slagle, an architect for the project and director of K-12 projects at the TowerPinkster design firm, told the Washington Post he wanted to create a welcoming environment for students without compromising campus security.

Construction for the entire project is expected to finish in 2021. Fruitport School District students go back to school on Sept. 3.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

  • Tufts University Breaks Ground on Two New Residence Halls

    Tufts University in Medford, Mass., recently broke ground on two new residence halls with a total capacity of 664 beds, according to local news. The project’s ultimate goal is to expand on-campus housing and reduce pressure on the local housing market.

  • Clemson to Launch North America’s Largest College Campus Smart Parking Program

    Clemson University in Clemson, S.C., recently announced a partnership with smart parking and curbside management solutions provider eleven-x to launch a smart parking initiative for its population of 29,000 students and faculty, according to a news release.

Digital Edition