Monastery Converted to High School Science Wing with Planetarium

Marist High School, a Chicago-based Catholic school, transformed a former monastery into a high-tech science wing with a planetarium. The $15 million project was funded by two major donors and also by parents, alumni and friends of Marist. Renovating the 28,000 square foot former monastery increased the school’s learning space by 20 percent.

Marist High School, a Chicago-based Catholic school, transformed a former monastery into a high-tech science wing with a planetarium.

The new science wing was created to provide hands-on learning experiences and collaboration. "I want [students] to have their hands on something every day,” Science Curriculum Coordinator Carrie Spano told a local news reporter. “I want them to be able to learn by doing."

With that goal in mind, the building includes:

  • Ten new science labs dedicated to a specific branch of science including two bio labs, two chemistry labs and one AP lab;
  • An anatomy and physiology lab with a glass-walled space that looks like a hospital room;
  • Two physics labs with direct access to the courtyard for outdoor experimentation;
  • An observatory dome for astronomy studies;
  • A forensics crime lab;
  • An environmental science lab and green roof;
  • A collaboration center for teachers to meet and plan cross-curricular STEM lessons;
  • Mobile furniture that allows classes to change quickly from lecture to group work to lab experiments;
  • Student and teacher access to labs for independent research and experiments; and
  • A walkover path from the existing school hallway.

The planetarium was designed and installed by Spitz, the same company who installed the Adler Planetarium in downtown Chicago. In addition, students will have access to a 3D viewer created by Zygote that allows them to use a touch screen to explore human anatomy including the muscular or skeletal system.

Fox and Fox served as architect and construction was completed by Henry Brothers. The project was managed by Jones Lang LaSalle and landscaping along the exterior and in the courtyard was done by Quattrocki.

The science wing debuted on Aug. 23, the first day of school.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Wisconsin District Launches Series of Improvement Projects

    The School District of River Falls in River Falls, Wis., recently launched a series of five construction projects scheduled for completion by September 2025, according to a news release. The district partnered with Bray Architects for their design and with integrated construction management firm Kraus-Anderson (KA) for their construction.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

Digital Edition