Sartell SD Designs New High School With Career Options in Mind

After voters approved a bond in 2016 and after years of planning and design, Minnesota’s Sartell High School will open on Sept. 3. The nearly $90 million project features open common spaces, classrooms with floor-to-ceiling windows, small-group and large-group work spaces, as well as dedicated labs to create digital media projects.

After voters approved a bond in 2016 and after years of planning and design, Minnesota’s Sartell High School will open on Sept. 3. The nearly $90 million project features open common spaces, classrooms with floor-to-ceiling windows, small-group and large-group work spaces, as well as dedicated labs to create digital media projects.

The new building design places a focus on helping students prepare for a variety of options after they graduate including joining the workforce, following a two-year post-secondary path and attending a four-year college. Spaces for welding and fabrication, a wood shop, an automotive shop and a professional-grade kitchen for culinary arts can be found in the building. A coffee shop and school store in the commons area will give students opportunities to manage a business. A lab will be used in partnership with a local clinic, St. Cloud Orthopedics, where students can learn from medical professionals.

“We need to prepare kids to multi-task,” Sartell-St. Stephan ISD Superintendent Jeff Schwiebert told a local newspaper. “Their careers will not be the same day in and day out. They will work in teams. Our challenge is to make sure we have the space and our curriculum and methods meet those changes.”

The new high school was designed by Cuningham Group in collaboration with IIW-Minnesota. Students and teachers’ input of how they use the school space was incorporated into the design.

Three Learning Neighborhoods house visible, flexible and adaptable learning spaces. Each has a variety of large-group rooms, informal gathering spaces, small-group rooms and space for individual work.

More highlights from the new building include:

  • The Commons, a two-story space with bright colors, tables and comfortable chairs and couches with second-floor windows. Eight science labs overlook the Commons and windows open to the technical education and arts classrooms.
  • Three Learning Neighborhoods house visible, flexible and adaptable learning spaces. Each has a variety of large-group rooms, informal gathering spaces, small-group rooms and space for individual work.
  • A main gym that seats 2,000 people with two giant video screens. An eight-lane swimming pool with an expanded deck for teams and 400 spectator seats. Multiple practice fields and tennis courts on more than 60 acres of green space.

Tours of the new school will be open to the public on Sept. 14th during their Grand Opening & Community Open House event.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition