Englewood STEM High School Debuts After Four School Closures

Englewood STEM High School in Chicago is open this week after the district closed down four high schools due to lack of academic achievement and under enrollment of students. Over the past decade the schools — Hope, Harper, TEAM and Robeson — experienced a 70%-85% declines in student enrollment, reported the Chicago Tribune.

The $85 million neighborhood school is brightly lit, with lots of windows and features colorful murals and inspirational words on the walls that integrates STEM symbols with traditional West African art patterns.

The new three-story building was built on the grounds of the former Robeson campus which closed in 2018. More than 400 students are registered to start the school year and nearly all students are African American. In addition, 88% of students are low-income and 22% are “diverse learners,” meaning they have different learning needs.

The $85 million neighborhood school is brightly lit, with lots of windows and features colorful murals and inspirational words on the walls that integrates STEM symbols with traditional West African art patterns.  

“One of the things that we were really adamant about was the power of images, and how images play in how people see themselves,” Principal Conrad Timbers-Ausar told the Chicago Sun-Times. “There’s some images that we wanted to have as students and families come to the school that they can see themselves doing different things throughout the building.”

Englewood STEM, which is the first new school to be built since the 1970s in the neighborhood, has an on-site health clinic on the first floor that’s open to students, staff and the community. Chicago Public Schools calls the classrooms in the high school as “world-class multipurpose educational spaces” where students will focus on science, technology, engineering and math. The gym/auditorium seats about 800 and the grounds feature an athletic facility with a baseball diamond and football field.

The school’s mascot is the panthers, which was chosen by community vote and inspired by the blockbuster film “Black Panther.”

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Wisconsin District Launches Series of Improvement Projects

    The School District of River Falls in River Falls, Wis., recently launched a series of five construction projects scheduled for completion by September 2025, according to a news release. The district partnered with Bray Architects for their design and with integrated construction management firm Kraus-Anderson (KA) for their construction.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

Digital Edition