New Minnesota High School Features Industrial Tech Spaces

Minnesota’s Menahga High School opened its doors this week, while construction continues in a few areas of the school like the gym and the kitchen. The school is scheduled to be fully completed in October.

The two-level building is brightly lit with numerous windows and an open-air commons area.

“There’s so much natural light coming in,” Ashley Bachmann, a math teacher at the school, said. “I like all the different work spaces they’ve created, with tables and chairs. I think that’s so cool. It’s such a neat idea for kids to work versus just the classroom.”

The high school will feature state-of-the-art science labs, a metal shop with 10 welding stations and an industrial tech shop with small engine and small projects space. Principal Mark Frank told a local newspaper that the long-term goal is to assemble student teams who design and build their own ice-fishing houses.

The new gym scoreboard uses the same software as U.S. Bank Stadium. Students will be able to create graphics, like photos of the team lineups, for the new scoreboard.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.