Net-Zero Middle School to Be Built Outside of Houston

A new middle school, just outside of Houston, will have a net zero design, meaning the building will produce as much energy as it consumes. Corgan, the architecture firm that designed the school, presented the latest schematics at a Fort Bend ISD school board meeting on Sept. 16.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs. The energy produced by the solar panels will be converted on-site and sent to the power company who will give the school credit for the power it produces, reported Community Impact Newspaper.  

“We are going to achieve net zero by using renewable energy resources and an enhanced building envelope that will reduce the heating and cooling load on this building,” said AJ Sustaita, an education architecture project manager at Corgan.

The 2018 FBISD bond election included funds for the new middle school. The school district approved Corgan to prepare design and construction documents for the school in December. The proposed project budget is more than $10 million.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

Digital Edition