Net-Zero Middle School to Be Built Outside of Houston

A new middle school, just outside of Houston, will have a net zero design, meaning the building will produce as much energy as it consumes. Corgan, the architecture firm that designed the school, presented the latest schematics at a Fort Bend ISD school board meeting on Sept. 16.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs. The energy produced by the solar panels will be converted on-site and sent to the power company who will give the school credit for the power it produces, reported Community Impact Newspaper.  

“We are going to achieve net zero by using renewable energy resources and an enhanced building envelope that will reduce the heating and cooling load on this building,” said AJ Sustaita, an education architecture project manager at Corgan.

The 2018 FBISD bond election included funds for the new middle school. The school district approved Corgan to prepare design and construction documents for the school in December. The proposed project budget is more than $10 million.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at ymarquez@1105media.com.

Featured

  • Pfluger Architects Announces Promotions of Seven Staff Members

    Texas-based architecture firm Pfluger Architects recently announced that it has promoted seven staff members to senior-level positions. One of the promotions is that of Dallas-based Senior Project Architect Chad Martin to Principal, according to a news release.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • Greenheck Debuts New Energy Recovery Ventilator

    Greenheck recently released a new energy recovery ventilator, the ERVi, designed for small indoor spaces like basements and mechanical rooms, according to a news release. The hardware can fit through a 30-inch door and be mounted on the ceiling for retrofit and decarbonization projects.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.