HSB Launches New IoT Solution for Schools

Hartford Steam Boiler, part of Munich Re, announced a new customized IoT solution for schools to protect buildings and equipment against water leaks, freezing pipes, mold and perishable goods spoilage.

HSB Connected Technologies will monitor buildings and equipment 24/7 and alert school officials immediately of any potential risks. School officials will be able to check on conditions in gyms, locker rooms, offices and other spaces on campus with the use of a mobile app.

“We think of schools as bustling with students, teachers and activity,” said Jack Volinski, HSB senior vice president in a press release.  “But what about when the school is empty?  Perhaps at night, on a holiday weekend, or winter and summer breaks?  Our IoT solution monitors property and equipment risks and sends an alert to proactively mitigate damages that traditional building management systems cannot prevent.”

HSB’s new school solution is powered by advanced algorithms that consider multiple risk factors. The IoT sensors use the latest LoRaWAN® network protocols to provide long range and strong signal strength across school buildings.

The IoT solution is available through school risk pools and property-casualty insurance companies that partner with HSB.

Learn more at hsbconnectedtechnologies.com

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.