HSB Launches New IoT Solution for Schools

Hartford Steam Boiler, part of Munich Re, announced a new customized IoT solution for schools to protect buildings and equipment against water leaks, freezing pipes, mold and perishable goods spoilage.

HSB Connected Technologies will monitor buildings and equipment 24/7 and alert school officials immediately of any potential risks. School officials will be able to check on conditions in gyms, locker rooms, offices and other spaces on campus with the use of a mobile app.

“We think of schools as bustling with students, teachers and activity,” said Jack Volinski, HSB senior vice president in a press release.  “But what about when the school is empty?  Perhaps at night, on a holiday weekend, or winter and summer breaks?  Our IoT solution monitors property and equipment risks and sends an alert to proactively mitigate damages that traditional building management systems cannot prevent.”

HSB’s new school solution is powered by advanced algorithms that consider multiple risk factors. The IoT sensors use the latest LoRaWAN® network protocols to provide long range and strong signal strength across school buildings.

The IoT solution is available through school risk pools and property-casualty insurance companies that partner with HSB.

Learn more at hsbconnectedtechnologies.com

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.