New York STEAM Pre-K Center Begins Construction

New York City officials including Mayor Bill de Blasio announced the start of construction of a new state-of-the-art Pre-K Center in Flushing Meadows – Corona Park, Queens on Oct. 31. The center will focus on early childhood STEAM education, offering a first of its kind in New York City. The center is partnering with New York Hall of Science to offer teachers, students and families direct access to resources.

“Free, full-day, high-quality Pre-K puts our kids on the path to success, and we have made it a right – not a privilege – for every 4-year-old in New York City,” said Mayor de Blasio. “This new Pre-K Center is proof of our commitment to expanding Pre-K to meet the needs of every community, and investing in state-of-the-art STEAM education for our children.”

The Pre-K Center will serve 300 students and will feature 17 Pre-K classrooms, two exercise rooms and outdoor playground and a community and parent room. The center is being built by the School Construction Authority and is scheduled to open in Fall 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Fellowes Expands Finish and Wall-Covering Options for Architectural Wall Systems

    Fellowes Architectural Solutions has expanded the materials library for its architectural wall systems with a series of new finishes and wall-covering options intended to provide architects and designers with additional choices for commercial interiors, according to a company news release.