Construction Completed on El Capitan High School’s Events Center

Construction has been completed on the new $10.7 million, 15,000-square-foot event center for Grossmont Union High School District’s El Capitan High School in Lakeside, California. C.W. Driver Companies constructed the facility and HED served as the architect.  

Consisting of two buildings on the campus’ south side, the new event center houses band, drama, and dance spaces and features 250 retractable seats to accommodate theater productions, performances, and events. It also includes a lobby, concession and snack bar, storage space, AV room, and green room.

“It was a pleasure to partner with El Capitan High School to create a multifunctional events center that serves as a new focal point for the campus,” said Hank Withaar, vice president at C.W. Driver Companies. “We leveraged our extensive K-12 experience to build a facility that will serve students well and benefit the school’s performing arts programs for years to come.”

The new center’s design references the school’s outdoor surroundings including the lines and angles of the region’s mountains and horizons, and incorporated the region’s iconic sycamore trees into the landscaping.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition