New Elementary School Unveils Custom Digital Displays

Cicero District 99 located in Cicero, Illinois wanted to incorporate technology in interesting ways at their newly-built elementary school. The district decided to install engaging digital displays in various locations throughout Sherlock School, including the main entrance and the 4th floor interactive space.

The district decided to install engaging digital displays in various locations throughout Sherlock School, including the main entrance and the 4th floor interactive space.

The school chose commercial OLED displays from LG Business Solutions, including curved displays that are adaptable for ceiling and wall designs. The displays offer immersive experiences and showcases content in ways that are welcoming to students, teachers, parents, and guests.

The displays used at the school required specific mounting systems to ensure safe installation and maintenance, Senior Enterprise Account Manager, Adams Salinas told Spaces4Learning. The school specifically worked with Snap Install and Peerless-AV to mount the displays.

“Peerless-AV designed custom video wall mounting systems to be used in the lobby, and Peerless-AV standard video wall mounts were selected for the video walls located on the 4th floor,” Salinas said. “Schools looking to employ a similar solution should consult with a local systems integration partner to implement a digital display system of this scale.”

The district decided to install engaging digital displays in various locations throughout Sherlock School, including the main entrance and the 4th floor interactive space. The main lobby features 34 curved LG Open Frame OLED displays — 24 units on the ceiling and 10 units in two columns on the wall, supported by Peerless-AV’s mounting solutions. The 4th floor includes two video walls, each made up of eight LG Narrow Bezel displays and eight Peerless-AV SmartMount Supreme Full Service Video Wall Mounts.

“While the benefits of implementing digital signage are truly endless, this signage specifically give IT staffers the ability to communicate to students and staff in real time and allows them to incorporate a theme or message in any given location.” Salinas said.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Hawaii Elementary School Reopens Following $25M Campus Modernization

    Haʻaheo Elementary School in Hilo, Hawaii, has reopened to students following a three-year, $25-million campus modernization and expansion project that significantly increases the school's instructional space while preserving one of the island's oldest educational institutions, according to local news.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.