Francis Tuttle Technology Center Completed in Oklahoma City

OKLAHOMA CITY, OK – Francis Tuttle Technology Center, one of the premier career training schools in the state of Oklahoma, has recently seen the completion of the Francis Tuttle Industrial Technology Building on its Reno campus.

 As outlying communities continue to grow, the demand for access to affordable education and training follows. Francis Tuttle’s desire to continue their reach and expand class offerings resulted in a new building on their existing Reno campus. Designed by Bockus Payne, an interdisciplinary architecture and design firm, the 27,325-square-foot academic building consists of one story dedicated to core classes and student support areas that articulate a proud industrial presence while providing innovative solutions necessary to inform 21st-century students.

Francis Tuttle Industrial Technology Building

Image courtesy of Bockus Payne

The Bockus Payne team designed a facility that not only supports the needs of the diverse student population but that is also reflective of Francis Tuttle’s expanded trade offerings. It was important to reference the types of classes offered within the design intent — Advanced Manufacturing, Welding and Construction Trades. The building itself is identifiable with industrial technology but connects with existing themes from the original Francis Tuttle look. The introduction of Corten steel at entry will continue to patina over time, a nod to the welding module. At night, the name glows through cut outs within the steel structure, providing an added layer of detail and identity. The building is built off-axis to address views of the existing Reno building and provide a more dramatic appearance. Landscaping was carefully selected to complement — it’s simplistic and Oklahoma centered.

Indoors, students are greeted by a reception and spacious lounge area which also doubles as a safe room / shelter. Linear lighting runs throughout, providing added interest and a playful edge to the industrious building. Three large bays fill the remainder of the space; each with windows to view trades from the main public corridor. The interiors of each are neutral and durable, reflective of the school’s past, but contrast with bold pops of striking color that fill the ceilings to assist with wayfinding. Each bay contains a formal classroom, office, stair to mezzanine as well as expansive square footage dedicated to high-tech equipment for hands-on learning. The building design embodies the goals identified by the owner and supports the trades taught to develop a thriving incoming workforce.

Featured

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.