Entries Now Open for New Product of the Year Award

Spaces4Learning has opened its 2020 New Product of the Year award program. Each year, the program recognizes new and emerging products and technologies for the outstanding contributions they make to K–12 and higher education.

The contest is open to all companies that put a new product (or new version of a product) on the market in the last year (between June 2019 and June 2020).

The early bird deadline for entries is June 5. The final deadline is July 10. Complte details and a registration form can be found at spaces4learning.com/npoy.

Awards will be granted in the following categories:

Building Envelope

  • Doors

  • Outdoor Signage

  • Roofing

  • Walls

  • Windows

Building Interiors

  • Carpet

  • Ceilings

  • Floorings

  • Wall Coverings

Furniture, Fixtures and Equipment

  • Auditorium/Performance Space Furniture & Equipment

  • Cafeteria/Dining Hall Furniture & Equipment

  • Classroom Furniture & Equipment

  • Commons/Lounge Furniture & Equipment

  • Indoor Signage

  • Library Furniture & Equipment

  • Mail Room Equipment

  • Partitions & Room Dividers

  • Science/Vocational Furniture & Equipment

  • Waste Receptacles

Maintenance

  • Cleaning Equipment & Supplies

  • Paints & Coatings

Mechanical, Electrical and Plumbing

  • Building Controls

  • HVAC

  • Lighting

  • Plumbing

  • Surge Protection

Outdoor Environment

  • Outdoor Furniture

  • Recreation Systems

  • Signage

  • Vehicles

Restrooms/Locker Rooms

  • Dryers

  • Lockers

  • Locker Room Fixtures

  • Restroom Fixtures

Safety & Security

  • Access Control

  • Classroom Security Devices

  • Emergency Communication

  • Emergency Evacuation

  • Emergency Lighting

  • Fire & Life Safety

  • Locks & Door Hardware

  • Metal Detectors

  • Perimeter Control (Fencing, Bollards)

  • Traffic Control

Technology

  • A/V Equipment

  • Communication (Clocks, Bells, Intercoms)

  • Networking Equipment

  • Office Automation

  • Remote Learning

  • Software

Access the entry form and other details at spaces4learning.com/npoy.

About the Author

David Nagel is the former editorial director of 1105 Media's Education Group and editor-in-chief of THE Journal, STEAM Universe, and Spaces4Learning. A 30-year publishing veteran, Nagel has led or contributed to dozens of technology, art, marketing, media, and business publications.

He can be reached at [email protected]. You can also connect with him on LinkedIn at https://www.linkedin.com/in/davidrnagel/ .


Featured

  • Can AI Help Build Stronger Communities in Student Housing?

    Student housing success is shifting from operational performance to student experience, with belonging now at the center. A recent 2025 report underscores a growing emphasis on student well-being, community, and engagement, signaling that expectations now extend beyond logistics to ensure students feel supported in their living environments. AI is enabling that shift by reducing administrative workload and giving teams more time to focus on meaningful student engagement.

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.