Montana School Reopens With Safety Measures

Students at Willow Creek School in Montana returned to school on Thursday, reports CNN. The school, which serves between 50-60 students in grades K-12, is one of the first in the United States to reopen after schools shut down in March.

Some schools in Montana and in Idaho reopened last week with only a few weeks left until the summer break.

Montana Gov. Steve Bullock allowed schools in the state to reopen as early as May 7, with the decision left up to local districts. Gallatin County, where Willow Creek is located, had 146 confirmed coronavirus cases and one death. Currently, there are no active cases in the county, reported CNN.

Bonnie Lower, superintendent at Willow Creek, says 76% of parents were in favor of reopening the school, according to a poll.

Some of the changes Willow Creek implemented included:  

  • Staff wear masks and carry pool noodles to measure distance between students.
  • Each student's temperature is taken at the door.
  • Students alternate when they are let out of class so there are fewer students in the hallways at once.
  • Common areas are being disinfected regularly.
  • Every classroom has hand sanitizer and wipes.
  • Bathrooms are used one at a time.
  • There are distancing marks on the playground.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Empowering People Through Smart, Sustainable Campuses

    Sustainability is facing increasing scrutiny, with some questioning its costs and priorities. Yet for universities, it remains an essential driver of resilience, operational efficiency and long-term competitiveness. At the same time, there is a growing recognition that sustainable transformation is not just about reducing energy consumption and emissions to comply with tightening regulations ‒ it’s about creating vibrant, comfortable environments where people can thrive, innovate and connect. For university leadership, this is a complex balancing act, with rising energy costs and limited budgets only adding to the challenge.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • abstract representation of hybrid learning environment

    The Permanence of Change: Why Hybrid Is the New Baseline

    Hybrid learning is here to stay, and it's reshaping how campus spaces function.

Digital Edition