Expansion and Renovation Completed at Byron Nelson HS in North Texas

An expansion and renovation of Byron Nelson High School in Trophy Club, Texas was recently completed. The three-story, 75,000 square-foot expansion and renovation of the campus provides added capacity to a rapidly growing population in the Northwest Independent School District. The project was headed by Perkins & Will.

Byron Nelson High School. Courtesy of Perkins and Will.

The design emphasizes ‘learning on display’ with visibility to programs such as the school’s new Engineering Lab, a combination robotics and shop space; the Architecture Studio, which serves as a model making area; and the Biomedical Science program. The course areas are located near main hallways with glass walls to offer direct views inside so students, parents and visitors can observe classes.

Byron Nelson High School. Courtesy of Perkins and Will.

In addition, the Culinary Arts program was expanded and moved near the school’s bistro, which allows students to receive practicum experience, showcase their skills, and provide a service to students, staff and community.

Byron Nelson High School. Courtesy of Perkins and Will.

The expansion and renovation includes:

  • Collaboration areas to encourage one-on-one and small-group learning sessions.
  • All classrooms and labs have windows for natural light and views.
  • A reconfigured lobby to provide a secure entrance.
  • Renovated orchestra and band halls.
  • Renovated athletic locker and shower facilities.
  • Added athletic support spaces including PE lockers and restrooms, laundry facilities, a conference room, athletic offices.
  • A monumental staircase overlooking an outdoor space.

Hallway messaging and graphics showcase the school’s values, mascot, history, and the story of professional golfer and namesake Byron Nelson.

Perkins and Will took steps to make the project, collaborative, and environmentally friendly, according to a design brief. “Other sustainable steps taken include the school’s flooring, a no-wax solution of Forbo linoleum, which is bio-based and biodegradable, made with renewable and recycled ingredients, has CO2-neutral production, is naturally antimicrobial, and wax-free,” the design brief continues. “Non-VOC paint was also specified, as well as energy-friendly lighting, and high-efficiency HVAC systems were designed for this project.”

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • University of Kentucky Sees Positive Results from Energy Efficiency Program

    The University of Kentucky in Lexington, Ky., recently announced the results of its Energy Program in Facilities Management, put into place eight years ago, according to a news release. Between the fiscal years of 2017 and 2025, the university’s campus grew by 13.6% while the energy use per square foot dropped by 19.2%.

Digital Edition