Expansion and Renovation Completed at Byron Nelson HS in North Texas

An expansion and renovation of Byron Nelson High School in Trophy Club, Texas was recently completed. The three-story, 75,000 square-foot expansion and renovation of the campus provides added capacity to a rapidly growing population in the Northwest Independent School District. The project was headed by Perkins & Will.

Byron Nelson High School. Courtesy of Perkins and Will.

The design emphasizes ‘learning on display’ with visibility to programs such as the school’s new Engineering Lab, a combination robotics and shop space; the Architecture Studio, which serves as a model making area; and the Biomedical Science program. The course areas are located near main hallways with glass walls to offer direct views inside so students, parents and visitors can observe classes.

Byron Nelson High School. Courtesy of Perkins and Will.

In addition, the Culinary Arts program was expanded and moved near the school’s bistro, which allows students to receive practicum experience, showcase their skills, and provide a service to students, staff and community.

Byron Nelson High School. Courtesy of Perkins and Will.

The expansion and renovation includes:

  • Collaboration areas to encourage one-on-one and small-group learning sessions.
  • All classrooms and labs have windows for natural light and views.
  • A reconfigured lobby to provide a secure entrance.
  • Renovated orchestra and band halls.
  • Renovated athletic locker and shower facilities.
  • Added athletic support spaces including PE lockers and restrooms, laundry facilities, a conference room, athletic offices.
  • A monumental staircase overlooking an outdoor space.

Hallway messaging and graphics showcase the school’s values, mascot, history, and the story of professional golfer and namesake Byron Nelson.

Perkins and Will took steps to make the project, collaborative, and environmentally friendly, according to a design brief. “Other sustainable steps taken include the school’s flooring, a no-wax solution of Forbo linoleum, which is bio-based and biodegradable, made with renewable and recycled ingredients, has CO2-neutral production, is naturally antimicrobial, and wax-free,” the design brief continues. “Non-VOC paint was also specified, as well as energy-friendly lighting, and high-efficiency HVAC systems were designed for this project.”

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.