New Mexico State University Solar Project Begins Construction

Construction of a new solar project at New Mexico State University began this week. The university has partnered with El Paso Electric (EPE) on the initiative that they call Aggie Power, which should be sufficient to power about one-third of the 900-acre NMSU campus in Las Cruces. They expect to complete the construction by this fall, and the project has been in the works since 2018. The goal of the partnership is to move forward on “mutual goals related to state renewable energy, climate action, and micro-grid development.”

Aggie Power is intended to not only provide the university with a source of renewable energy, but also to act as a “living laboratory” that offers training and research initiatives for electrical engineering faculty and students. Another benefit is that it will give the university a power boost between noon and early evening, when the demand for power is greatest.

New Mexico State University solar project construction
Source: New Mexico State University

“If we can receive solar power at that optimal time,” said Pat Chavez, director of Utilities and Plant Operations, “it means Aggie Power will allow NMSU to lower the need for energy during the time in which energy costs are at their highest and rely less on power from conventional, natural-gas-powered energy.”

Construction is taking place across 29 acres of the university-owned Arrowhead Park. The terms of the partnership dictate that EPE will own, run, maintain, and take ultimate responsibility for the process. The three-megawatt solar photovoltaic project also includes single-access tracking solar panels and a single-megawatt battery pack from Tesla.

When finished, Aggie Power will be the largest of three renewable-energy sources on campus. Chavez expects the project to provide the university with more flexibility regarding energy sources and managing utility rates.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Pangram Secures Funding for AI Detection Technology

    Pangram, which provides technology that detects AI-generated text, recently announced that it has secured nearly $4 million in pre-seed and seed funding, according to a news release. The most recent round of investments, totaling $2.7 million, come on top of the pre-existing seed fund of $1.25 million.

  • Key Considerations for Office-to-Higher-Education Facility Conversions

    Since the onset of the COVID-19 pandemic, office-to-alternative-use conversions have become a recurring subject of urban development discourse. Office utilization rates across major U.S. cities remain below 50%, with vacancy rates exceeding 27% in San Francisco and 16% in New York. Higher education facilities present programmatic and spatial use cases that align readily with the typical characteristics of commercial office buildings.

  • Design Firm Populous Acquires Fentress Architects

    Design firm Populous, which specializes in sports and entertainment venues, recently announced its acquisition of Fentress Architects, based in Denver, Colo., according to a news release. Fentress’ primary focus is aviation projects and public buildings like museums, convention centers, and government facilities

Digital Edition