Oakwood Schools to Receive New HVAC System

One of the only remaining components of the $18 million Oakwood City Schools renovation project in Dayton, Ohio, is the installation of a brand-new HVAC system for the high school/junior high building. Currently, about half of the 97-year-old building is running on a new system, and the other half still uses an outdated, steam-heated network, according to school district Operations Coordinator Todd Scott.

Scott said that renovations to the remaining half “will not start until we get safely through winter, when we won’t need them any more for the rest of the year and we can finish off tying all of the HVAC together once all of the rooms are done.”

The construction project, which has been in the works since 2019, is on budget and slated to be finished by August. The goal is to improve the infrastructure of buildings with an average age of more than 90 years old. Other upgrades include replacing roofing, adding new boilers, and bathroom renovations.

The school’s ventilation system is being reworked with the COVID-19 pandemic in mind. The variable refrigerant flow (VRF) system will provide better quality and higher-efficiency heat, and the distribution will allow the flow to mix with outside fresh air “to make sure we’re getting enough fresh air in the building for kids and staff,” said Scott.

Renovations in 2004 updated the heating and cooling systems in part of the building. During this next part of construction, the VRF system will be retrofitted into the rest of it.

The district is partnering on the project with Danis Construction, which has already almost completed work at two other schools. In addition to the HVAC system, remaining renovations to be finished at the high school/junior high building include ceiling replacements with new LED lights, environmental abatement, remodeling bathrooms, and installing a new electric transformer.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Recent University of Pennsylvania Projects Receive LEED Certifications

    The University of Pennsylvania in Philadelphia, Penn., recently announced that three of its recent construction projects have earned LEED certifications, according to university news. The Vagelos Laboratory for Energy Science and Technology (VLEST) received a LEED Platinum certification, Amy Gutmann Hall a LEED Gold, and the OTT Center for Track and Field a LEED silver.

  • UNL Kiewit Hall

    Designing for Engineering Excellence: Integrating Sustainability and Wellness at UNLs Kiewit Hall

    Kiewit Hall at the University of Nebraska-Lincoln exemplifies how academic institutions can integrate sustainability and wellness into modern learning environments. With an integrated and collaborative team approach, Kiewit Hall addresses enhanced learning and creativity, physical health, and mental wellness, and fosters a sense of community through innovative design, operations, and policy solutions.

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

  • Empowering People Through Smart, Sustainable Campuses

    Sustainability is facing increasing scrutiny, with some questioning its costs and priorities. Yet for universities, it remains an essential driver of resilience, operational efficiency and long-term competitiveness. At the same time, there is a growing recognition that sustainable transformation is not just about reducing energy consumption and emissions to comply with tightening regulations ‒ it’s about creating vibrant, comfortable environments where people can thrive, innovate and connect. For university leadership, this is a complex balancing act, with rising energy costs and limited budgets only adding to the challenge.

Digital Edition