Austin ISD Surveys Damage After Winter Storm

Austin Independent School District (AISD) officials in Austin, Texas, spent last week walking through schools and surveying the aftermath of the recent wave of winter storms. The verdict: Ninety of the district’s 130 schools were affected, and the total damage is estimated at about $15 million.

The damage includes HVAC systems that have gone down, broken water lines and supply lines, and flooding from adjacent properties that seeped into schools, according to Matias Segura, AISD operations manager. At least 15 school kitchens in the district experienced broken freezers, spoiled food, and a lack of running water.

Winter storm

“We feel extremely lucky. I think with the amount of power outages and alarms we heard, we were expecting a lot more [of the refrigerators to be broken],” said AISD interim director of Food Service and Warehouse Operations Christine Steenport. She said that maintenance teams are “working on gathering all that information, making sure there are plumbers on site to fix leaks and identify areas where that help is needed.”

Most schools in the district were able to welcome students back on March 1. However, for the most severely damaged schools—Kocurek Elementary School, Bertha Sadler Means Young Women’s Academy, Gus Garcia Young Men’s Leadership Academy, and Bowie High School—plans to repair and reopen are still a work in progress.

The funding for repairs is coming from the school district’s general fund, with expectations for reimbursement by either FEMA or insurance. Segura said that some wings of the schools that opened on March 1 may still be closed for student and faculty safety.

“Our commitment is to make sure that our facilities are warm, safe, and dry. That is absolutely critical. We will not open a space up until it’s 100% ready to go,” said Segura. “What that means is that we will need patience. We are going to need some grace to get through the work.”

Across Central Texas, many other school districts endured similar problems. At the Hays CISD, the library flooded. At the Eanes ISD, workers and school officials removed soaked sheet rock and drywall and carried it outside to be thrown away during their damage survey. And in Burnet CISD, a whole campus auditorium flooded thanks to a cracked pipe.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • Kimball International Launches Season 5 of Alternative Design Podcast

    Commercial furnishings manufacturer Kimball International recently premiered the fifth season of its Alternative Design podcast, according to a news release. The first episode was released on March 17, and new episodes will launch monthly. The podcast discusses forces that shape built environments, from work to housing to healthcare to human wellness.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

Digital Edition