Ann Arbor Schools to See $63M in AC, Lighting Upgrades

Last week, the Ann Arbor School Board in Ann Arbor, Mich., approved $63 million in funding for air conditioning and lighting renovations at 13 schools in the district, as well as contracts for future architectural and engineering projects.

Included in that figure are air conditioning and LED lighting updates at Burns Park and Angell Elementary Schools ($3.3 million), Community High School ($8.99 million), Scarlett Middle School ($893,000), and Tappan Middle School ($20.65 million). The renovations are scheduled for the summer 2021 and summer 2022, and each bid total includes a 10% contingency fee.

The school board also approved architectural and engineering service contracts with Stantec of Farmington Hills and Fishbeck of Novi. These two firms are tasked with designing renovations for other projects set to begin during summer 2022 and summer 2023. The lighting and AC projects were marked as early priorities when Ann Arbor Public Schools (AAPS) campaigned for the $1 billion capital bond that voters approved in 2019.

Estimated construction costs of $15 million for Stantec and $14 million for Fishbeck (of which each firm will receive a 4% professional fee) were approved for the following projects: Air conditioning, LED lighting, and fire suppression at Clague Middle School and Forsythe Middle School; air conditioning and LED lighting at Bach Elementary School, Eberwhite Elementary School, Pittsfield Elementary School, and Wines Elementary School; and LED lighting upgrades at Pioneer High School and Allen Elementary School.

During February, the board had previously approved about $15 million of these funds for projects at five of the schools. The ultimate goal is to help the district save money on energy costs and reduce its carbon footprint.

“When you bring in air conditioning, obviously it’s using more energy, bringing up the carbon footprint and general fund expenditures,” said AAPS executive director for capital projects Emile Lauzzana. “We’re offsetting the additional load or cost of electricity by implementing LED lighting and solar power.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Universities Continue to Launch Multimillion-Dollar Campus Transformations

    What makes the current wave of campus development especially noteworthy is its emphasis on multi-use functionality and community integration. Institutions are no longer investing solely in academic or athletic facilities in isolation. Instead, they are creating destinations that blend recreation, health, housing, and event-driven economic activity.

  • Designing for Every Mind

    Learning environments have the power to shape not just what students know, but who they become. When a school is designed with genuine empathy—for the full range of ways students think, sense, and engage with the world—it becomes more than a building. It becomes a catalyst for growth, confidence, and belonging. That is the animating idea behind neurodiverse design, and it is one that is transforming how more architects and designers are thinking about school design.