Ann Arbor Schools to See $63M in AC, Lighting Upgrades

Last week, the Ann Arbor School Board in Ann Arbor, Mich., approved $63 million in funding for air conditioning and lighting renovations at 13 schools in the district, as well as contracts for future architectural and engineering projects.

Included in that figure are air conditioning and LED lighting updates at Burns Park and Angell Elementary Schools ($3.3 million), Community High School ($8.99 million), Scarlett Middle School ($893,000), and Tappan Middle School ($20.65 million). The renovations are scheduled for the summer 2021 and summer 2022, and each bid total includes a 10% contingency fee.

The school board also approved architectural and engineering service contracts with Stantec of Farmington Hills and Fishbeck of Novi. These two firms are tasked with designing renovations for other projects set to begin during summer 2022 and summer 2023. The lighting and AC projects were marked as early priorities when Ann Arbor Public Schools (AAPS) campaigned for the $1 billion capital bond that voters approved in 2019.

Estimated construction costs of $15 million for Stantec and $14 million for Fishbeck (of which each firm will receive a 4% professional fee) were approved for the following projects: Air conditioning, LED lighting, and fire suppression at Clague Middle School and Forsythe Middle School; air conditioning and LED lighting at Bach Elementary School, Eberwhite Elementary School, Pittsfield Elementary School, and Wines Elementary School; and LED lighting upgrades at Pioneer High School and Allen Elementary School.

During February, the board had previously approved about $15 million of these funds for projects at five of the schools. The ultimate goal is to help the district save money on energy costs and reduce its carbon footprint.

“When you bring in air conditioning, obviously it’s using more energy, bringing up the carbon footprint and general fund expenditures,” said AAPS executive director for capital projects Emile Lauzzana. “We’re offsetting the additional load or cost of electricity by implementing LED lighting and solar power.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Designing for Every Mind

    Learning environments have the power to shape not just what students know, but who they become. When a school is designed with genuine empathy—for the full range of ways students think, sense, and engage with the world—it becomes more than a building. It becomes a catalyst for growth, confidence, and belonging. That is the animating idea behind neurodiverse design, and it is one that is transforming how more architects and designers are thinking about school design.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • Purdue Fort Wayne Opens New Student Housing Complex

    Purdue University Fort Wayne (PFW) in Fort Wayne, Ind., recently held a ribbon-cutting ceremony for a new, 600-bed student housing complex on campus, according to a news release.