San Jacinto College Goes Solar

San Jacinto College, located in the metroplex area of Houston, Texas, has announced plans to add solar electricity arrays to two of its buildings. The arrays, designed and installed by Sunfinity Renewable Energy, are set to lower the school’s utility costs by millions and contribute to better air quality in the area.

“Solar generation is just one part of the college’s commitment to improving our energy efficiency,” said Dr. Brenda Hellyer, San Jacinto College Chancellor. “We have always been a trusted steward of the community’s resources. These solar arrays are simply a visible reminder of that ongoing commitment.”

One of the arrays, a 391 kW solar system with 990 solar panels, will go into the Central Campus’ Anderson-Ball Classroom Building, slated to open in Jan. 2022. The building measures in at 122,000 square feet, and is notable for using foundations from previous campus buildings and as the largest educational building in the country made of mass timber.

The other array, a 263 kW system with 667 solar modules, will go into the Jones Building on South Campus. The Jones Building is currently seeing a $13M renovation project that started late last year and is scheduled to finish by fall 2021. Part of the renovations include updating the classrooms for peak period use.

“Sunfinity has helped a wide range of businesses reap the benefits of solar energy,” said Sunfinity Chairman and CEO John Billingsley. “That includes nonprofit and for-profit organizations, but bottom line – it’s about the bottom line. A ‘commercial’ solar system can return hundreds of thousands of dollars—even millions—that can go toward other priorities. We think San Jacinto College has made a wise decision in going solar, and we appreciate their confidence in us.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • Washington State District Breaks Ground on New Elementary School

    Cheney School District No. 360 in Spokane County, Wash., recently announced that construction has begun on a new elementary school, according to local news. The district held a groundbreaking ceremony on May 18 in Airway Heights for the yet-to-be-named school, which is scheduled to open in fall 2027.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.