Florida High School Begins $48.5M Renovation Project

Clearwater High School, part the of Pinellas County School System in Clearwater, Fla., has officially begun a $48.5 million modernization project. The school was originally built in the 1950s, and the project will involve demolishing 17 buildings around campus, constructing seven new ones, and renovating five more. The school system is working with the architecture firm Hepner Architects, Inc. and general contracting firm JE Dunn to complete the initiative.

The new construction will house amenities like an administration suite with multi-use collaborative space, a Central Energy Plant, a cafeteria, a media center, science classrooms, general classroom learning suites, ESE classrooms, and a new parking lot to be used for the school’s driver’s ed course. The football stadium will also get a new entrance and new synthetic turf for track and field facilities.

Renovation and remodeling work will include a new exterior and interior paint job; installing new HVAC equipment and flooring; converting classrooms into a new Family and Consumer Science room; and adding new ceilings, lights, flooring, and windows to several buildings. The plan also features a beautification element to the part of campus facing Gulf to Bay Boulevard.

JE Dunn Vice President Jake Nellis expressed enthusiasm that work on the project is finally underway. “We’re excited to be part of this significant renovation that will have a tremendous impact on the community,” he said. “The new façade will in fact be remarkable and will be a landmark in the [Tampa] Bay Area.”

The work is currently scheduled to be finished in fall 2023.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.