Florida High School Begins $48.5M Renovation Project

Clearwater High School, part the of Pinellas County School System in Clearwater, Fla., has officially begun a $48.5 million modernization project. The school was originally built in the 1950s, and the project will involve demolishing 17 buildings around campus, constructing seven new ones, and renovating five more. The school system is working with the architecture firm Hepner Architects, Inc. and general contracting firm JE Dunn to complete the initiative.

The new construction will house amenities like an administration suite with multi-use collaborative space, a Central Energy Plant, a cafeteria, a media center, science classrooms, general classroom learning suites, ESE classrooms, and a new parking lot to be used for the school’s driver’s ed course. The football stadium will also get a new entrance and new synthetic turf for track and field facilities.

Renovation and remodeling work will include a new exterior and interior paint job; installing new HVAC equipment and flooring; converting classrooms into a new Family and Consumer Science room; and adding new ceilings, lights, flooring, and windows to several buildings. The plan also features a beautification element to the part of campus facing Gulf to Bay Boulevard.

JE Dunn Vice President Jake Nellis expressed enthusiasm that work on the project is finally underway. “We’re excited to be part of this significant renovation that will have a tremendous impact on the community,” he said. “The new façade will in fact be remarkable and will be a landmark in the [Tampa] Bay Area.”

The work is currently scheduled to be finished in fall 2023.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.