Seminole County School District Proposes PreK-12 School Facility

Officials in the Seminole County School District, headquartered in Donalsonville, Ga., recently announced a proposal to build a new, all-inclusive, PreK-through-12 school facility. They attribute the need for a new building to the age of current facilities and continuing repairs to buildings damaged by Hurricane Michael, among others. The new school would lie south of the existing middle-high school on Georgia Highway 39 South.

A comprehensive survey of existing Seminole County schools revealed that it would be cheaper to build a new facility than perform the necessary upgrades to Seminole County Elementary School and Seminole County Middle/High School. Building a single, all-in-one facility also allows the school system to receive more funding from the Georgia Department of Education than it would for two distinct schools.

“To maximize our money from the state and to ensure all of our children are in modern, safe, and secure facilities, we are planning for a new PreK-12 facility,” said Superintendent Mark Earnest. “The new facility would allow the school system to start fresh and not have to allocate money each year to the high price of repairs and failures that are occurring in our current buildings. This will allow the chance to lower power bills substantially, as well.”

Funding for the project would come through a Seminole County Education Special Purpose Location Option Sales Tax (ESPLOST). According to Donalsonville News, an ESPLOST “allows local districts to ask voters for the ability to levy and collect a one percent sales tax to help fund school facility and equipment improvements. It cannot be used to pay operation expenses, such as salaries. ESPLOSTs are enacted by referendum, and Seminole County’s ESPLOST vote will take place in November 2021.”

Seminole County School System is eligible for Low Wealth Project Specific funding, which helps school systems ranking in the bottom quarter of ESPLOST earnings. The district would receive up to $32 million for the project, whose total cost is estimated at $44 million.

In order to build the facility, the school system would have to renew the ESPLOST in November, and the district would have to issue bonds for up to $12 million. “If the ESPLOST does not pass in November, we would not be able to construct a new school,” Earnest said.

The new facility would be energy efficient and designed with student safety as its main priority. The school’s design would also totally separate older and younger students, grouping them in the traditional phases of Grades K-5, 6-8, and 9-12.

Further information is available here.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Countway Library at Harvard Medical School

    From Shadows to Sanctuary: The Transformation of Light at Countway Library

    The renovation of Countway Library at Harvard Medical School demonstrates how biophilic design and advanced lighting strategies transformed a formerly dark, insular space into a vibrant, welcoming hub that supports wellness, learning, and community engagement.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.