Seminole County School District Proposes PreK-12 School Facility

Officials in the Seminole County School District, headquartered in Donalsonville, Ga., recently announced a proposal to build a new, all-inclusive, PreK-through-12 school facility. They attribute the need for a new building to the age of current facilities and continuing repairs to buildings damaged by Hurricane Michael, among others. The new school would lie south of the existing middle-high school on Georgia Highway 39 South.

A comprehensive survey of existing Seminole County schools revealed that it would be cheaper to build a new facility than perform the necessary upgrades to Seminole County Elementary School and Seminole County Middle/High School. Building a single, all-in-one facility also allows the school system to receive more funding from the Georgia Department of Education than it would for two distinct schools.

“To maximize our money from the state and to ensure all of our children are in modern, safe, and secure facilities, we are planning for a new PreK-12 facility,” said Superintendent Mark Earnest. “The new facility would allow the school system to start fresh and not have to allocate money each year to the high price of repairs and failures that are occurring in our current buildings. This will allow the chance to lower power bills substantially, as well.”

Funding for the project would come through a Seminole County Education Special Purpose Location Option Sales Tax (ESPLOST). According to Donalsonville News, an ESPLOST “allows local districts to ask voters for the ability to levy and collect a one percent sales tax to help fund school facility and equipment improvements. It cannot be used to pay operation expenses, such as salaries. ESPLOSTs are enacted by referendum, and Seminole County’s ESPLOST vote will take place in November 2021.”

Seminole County School System is eligible for Low Wealth Project Specific funding, which helps school systems ranking in the bottom quarter of ESPLOST earnings. The district would receive up to $32 million for the project, whose total cost is estimated at $44 million.

In order to build the facility, the school system would have to renew the ESPLOST in November, and the district would have to issue bonds for up to $12 million. “If the ESPLOST does not pass in November, we would not be able to construct a new school,” Earnest said.

The new facility would be energy efficient and designed with student safety as its main priority. The school’s design would also totally separate older and younger students, grouping them in the traditional phases of Grades K-5, 6-8, and 9-12.

Further information is available here.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Fellowes Launches New 3D Modular, Product Configurators

    Contract interiors and architectural solutions provider Fellowes recently announced the launch of new 3D modular and product configurators for several of its product lines, according to a news release. The new products offer SIF file integration and pricing for the Volo, Markerboards, Sena, and Rising product lines in connection with 3D Cloud, which provides 3D product visualization and 3D digital asset management.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • Average Annual Number of Tornadoes per State

    New Tornado Wind Load Design Criteria in IBC Offer Improvements to Life Safety

    For the first time in U.S. building code history, the 2024 International Building Code (IBC) includes tornado wind load design criteria, marking a significant advancement in life-safety provisions.