UMass Medical School Reveals Design for Nine-Story Research Center

The University of Massachusetts Medical School, located in Worcester, Mass., unveiled the design this week for its new, $325-million therapeutics research and lab center. The New Education and Research Building, measuring in at 350,000 square feet, was designed by architecture firms ARC/Architectural Resources Cambridge and ZGF. The nine-story complex is scheduled to open in fall 2023.

“The New Education and Research Building plays a key role in the future of our institution,” said Michael F. Collins, Chancellor of the University of Massachusetts Medical School. “By co-locating strategic research programs and leveraging the power of collaboration, we will be able to fulfill our vision of life-changing therapies for some of the most intractable diseases we face.”

UMMS New Education and Research Building
Photo courtesy of ARC and ZGF

According to a news release, the facility will house the Departments of Neurology and Neurobiology, the Medical School’s Horae Gene Therapy Center, a new program in Human Genetics & Evolutionary Biology, the program in Molecular Medicine, an FDA-compliant manufacturing center for clinical trial therapeutics, and space for 77 principal researchers.

“At a time in our history when scientific discovery is so vital to public health, our team is proud to be designing a facility that will expand the mission and capacity of the UMass Medical research community,” said Bryan Thorp, Associate Principal at ARC/Architectural Resources Cambridge. “Everyone involved with the project is inspired by the dedication and commitment of the individuals behind this ongoing Worcester success story.”

The building was designed to meet the sustainability goals of achieving Net Zero Energy and LEED Gold Certification. Architectural features include a double-skin façade, geothermal heat pumps, and high-performance systems. Interior spaces integrate natural daylighting with active circulation and open, collaborative spaces to encourage productivity and a safe, healthy work environment.

“Through the mission of the UMMS researchers that will inhabit it and its high-performance architecture, the New Education and Research Building will address two grand challenges facing society: the threat of new and emerging diseases and the climate crisis,” said ZGF Partner Toby Hasselgren.

Terva | Trident will serve as the owner’s project manager, and Shawmut Design and Construction as the project’s construction manager.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.