Georgia Southern University Sees Completion of New Engineering Building

Georgia Southern University announced this week that JE Dunn Construction has completed construction on the university’s new Engineering and Research Building. The $60 million project was funded by the state of Georgia and serves as the new home for the College of Engineering and Computing. According to a press release, the new facility will help facilitate academic and institutional partnerships, as well as foster creative engineering for students.

“The Engineering and Research Building will greatly enhance our research capabilities as well as opportunities for our faculty to engage students in hands-on research and teaching projects,” said Mohammad S. Davoud, Ph.D., Dean of the Allen E. Paulson College of Engineering and Computing. “It will also increase our faculty’s ability to develop collaborative research projects with local industry and agency partners. Through the instructional research labs and academic spaces that bridge theory and practice, students will be prepared to solve today’s challenges and to make tomorrow’s discoveries.”

Georgia State University Engineering Building

The design and construction work took place under a Collaborative Project Delivery system, in which professors, the Georgia State Financing and Investment Commission (GSFIC), and the GSU facilities staff were involved in each phase of the project. JE Dunn mapped out various milestones and deadlines for the project and provided continuous, real-time budget updates. JE Dunn’s construction team was led by GSU alumnus Ryan Price.

“It was an honor to represent JE Dunn by returning to my alma mater to serve Georgia Southern University in bringing to life this new hallmark of the school’s engineering program,” said Price. “This building will serve generations and anchors a new corner of campus.”

The 140,625-square-foot building includes applied research spaces dedicated to manufacturing, civil, electrical, computer, and mechanical engineering. It also houses more than 35 labs for research in fields like robotics and automated manufacturing, nanomaterials manufacturing, traditional and CNC finishing, joining and welding, and a renewable energy roof deck lab, as well as flexible research space and 3D printing spaces for both metals and non-metals. It also includes one of the only Class 3 cleanrooms in the southeast.

Besides academic spaces including research spaces, classrooms, conference rooms, and administrative offices, the facility also has a 1,500-square-foot colloquium space (with a 500-square-foot balcony) to host industry gatherings.

“The investment of the Engineering and Research Building solidifies Georgia Southern University’s commitment to students in providing a world-class education in the engineering field, while providing the space and resources necessary to facilitate such,” said student Kristifer Bell. “I am enthusiastic to continue my research work and look forward to the interdepartmental collaboration that will be encouraged through the housing of new student and faculty labs under one roof.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNL Kiewit Hall

    Designing for Engineering Excellence: Integrating Sustainability and Wellness at UNLs Kiewit Hall

    Kiewit Hall at the University of Nebraska-Lincoln exemplifies how academic institutions can integrate sustainability and wellness into modern learning environments. With an integrated and collaborative team approach, Kiewit Hall addresses enhanced learning and creativity, physical health, and mental wellness, and fosters a sense of community through innovative design, operations, and policy solutions.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

Digital Edition