New Ontario Tech University Academic Building Nears Completion

A new $48-million building on the campus of Ontario Tech University's north Oshawa campus will "respond" to sunlight and solar orientation. The project will deliver 80,000 square feet of new, technology-enhanced academic, administrative and student support spaces along with amenities and social spaces to the Ontario Tech Academic Building. The full building is 111,000 square feet.

The building exterior, which combines concrete, metal, wood and stone, uses four types of shaped concrete panels throughout the entire structure. According to co-designer Montgomery Sisam Architects, the concrete panels are angled in different ways, creating differences in light and shadow and weightlessness and mass in the interior spaces as the solar orientation shifts during the day.

University of Ontario Institute of Technology (UOIT) solar orientation building
The new general academic and student building at Ontario Tech University is designed to revolve around solar orientation.
Source: Montgomery Sisam Architects

Parts of the building were also designed to be more highly visible and transparent, while others were meant to be "more hidden and tucked away." The side that faces the campus quad, for example, is highly visible as people approach from the exterior. That's where public activities are meant to happen. On Levels 1 and 2, the student union, enhanced-learning, lounge and study spaces are arrayed around a large open atrium, activating the perimeter and animating the building frontages. A stairway leads to the high-traffic student club space and conference center in the lower-level. Levels three, four and five are intended for student life amenities, classrooms and administrative offices, as well as smaller social spaces for quieter study.

On the exterior, a plinth and canopy wrap around the building at the ground floor, according to the designers, "to create a human scale at the street level."

Montgomery Sisam was joined by Architecture Counsel, which led the project's initial business case and feasibility study through to project completion.

It was planned as a facility where the campus community could "come together to learn, collaborate and unwind," the university noted in its construction update. The goals were threefold: to encourage students, faculty and staff "to stick around because they want to be here"; apply the latest technology, to encourage "student-to-student learning"; and be as sustainable as possible.

The building will eventually house:

  • The Faculty of Health Sciences' lecture theaters, academic offices and labs, including a high-tech simulation lab that will provide access to 3D solutions and augmented and virtual reality;
  • The Office of Student Life and support services; and
  • Ontario Tech University Student Union.

Previously, the student union and student life operations were housed in portables.

The structure is expected to be completed "as close as possible" to the target date of fall 2021, the university stated.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.

  • Hawaii Elementary School Reopens Following $25M Campus Modernization

    Haʻaheo Elementary School in Hilo, Hawaii, has reopened to students following a three-year, $25-million campus modernization and expansion project that significantly increases the school's instructional space while preserving one of the island's oldest educational institutions, according to local news.