Campbellsville University Broadcast Studio Gets LynTec Power Control System

Campbellsville University in Campbellsville, Ky., has partnered with JCA Media to select LynTec, an electrical power control solutions manufacturer for professional audio, video and lighting (AVL) systems, to supply products for the university’s broadcast studios. Integration firm JCA Media has already installed LynTec’s lighting control panels in other buildings around campus. With these previous experiences in mind, the firm installed LynTec’s Remote Control Braker Panel as a user-friendly, circuit-level zoned control mechanism in the university’s mass communication’s center’s television broadcast studios.

“We consistently use the company’s LCRP retrofit boxes for churches that are changing out their old-school dimming systems to LED, where they need to be able to have DMX relays to turn off their circuits,” said Alex Peake, JCA Media integration specialist. “LynTec has always been a great solution for us. It’s 100 percent reliable, and they have great customer support that always takes the time to walk me through any questions I might have. It was the perfect answer for the university’s TV studio.”

LynTec Power Control System
JCA Media Selected LynTec Panels to Power Broadcast Studio.

The single-panel RPC features the flexibility to work with a number of control platforms like DMX, HTTP, Telnet, sACN, RS-232, and BacNET. It offers features like circuit protection, power management, on/off control, and power sequencing. The RPC is programmed for three zones, consisting of the two studios and the control room. It provides protection from brownout as well as over- and under-voltage protection, sends notifications, and enables remote monitoring.

“The ability for broadcast teams to go live at any time depends on the seamless control and power protection of their AVL systems,” said LynTec president Mark Bishop. “The installation at Campbellsville University, under the guidance of JCA Media, illustrates how our RPC panel provides invaluable control and protection that improves the performance and lifespan of their AVL systems and fits right into any production workflow.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • concentric silhouettes of a human head

    How Physical Space Shapes the Mind: Designing for Better Learning Outcomes

    Research in environmental psychology and neuroscience increasingly suggests that the way a room is designed can influence memory, focus, or even a student's sense of belonging.

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

Digital Edition