Campbellsville University Broadcast Studio Gets LynTec Power Control System

Campbellsville University in Campbellsville, Ky., has partnered with JCA Media to select LynTec, an electrical power control solutions manufacturer for professional audio, video and lighting (AVL) systems, to supply products for the university’s broadcast studios. Integration firm JCA Media has already installed LynTec’s lighting control panels in other buildings around campus. With these previous experiences in mind, the firm installed LynTec’s Remote Control Braker Panel as a user-friendly, circuit-level zoned control mechanism in the university’s mass communication’s center’s television broadcast studios.

“We consistently use the company’s LCRP retrofit boxes for churches that are changing out their old-school dimming systems to LED, where they need to be able to have DMX relays to turn off their circuits,” said Alex Peake, JCA Media integration specialist. “LynTec has always been a great solution for us. It’s 100 percent reliable, and they have great customer support that always takes the time to walk me through any questions I might have. It was the perfect answer for the university’s TV studio.”

LynTec Power Control System
JCA Media Selected LynTec Panels to Power Broadcast Studio.

The single-panel RPC features the flexibility to work with a number of control platforms like DMX, HTTP, Telnet, sACN, RS-232, and BacNET. It offers features like circuit protection, power management, on/off control, and power sequencing. The RPC is programmed for three zones, consisting of the two studios and the control room. It provides protection from brownout as well as over- and under-voltage protection, sends notifications, and enables remote monitoring.

“The ability for broadcast teams to go live at any time depends on the seamless control and power protection of their AVL systems,” said LynTec president Mark Bishop. “The installation at Campbellsville University, under the guidance of JCA Media, illustrates how our RPC panel provides invaluable control and protection that improves the performance and lifespan of their AVL systems and fits right into any production workflow.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • T&T Construction Management Group Completes Pasco High School Expansion

    Pasco High School in Dade City, Fla., recently announced that it has completed an expansion project in partnership with T&T Construction Management Group, Inc., Harvard Jolly Architecture, and Williams Company.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

Digital Edition