Campbellsville University Broadcast Studio Gets LynTec Power Control System

Campbellsville University in Campbellsville, Ky., has partnered with JCA Media to select LynTec, an electrical power control solutions manufacturer for professional audio, video and lighting (AVL) systems, to supply products for the university’s broadcast studios. Integration firm JCA Media has already installed LynTec’s lighting control panels in other buildings around campus. With these previous experiences in mind, the firm installed LynTec’s Remote Control Braker Panel as a user-friendly, circuit-level zoned control mechanism in the university’s mass communication’s center’s television broadcast studios.

“We consistently use the company’s LCRP retrofit boxes for churches that are changing out their old-school dimming systems to LED, where they need to be able to have DMX relays to turn off their circuits,” said Alex Peake, JCA Media integration specialist. “LynTec has always been a great solution for us. It’s 100 percent reliable, and they have great customer support that always takes the time to walk me through any questions I might have. It was the perfect answer for the university’s TV studio.”

LynTec Power Control System
JCA Media Selected LynTec Panels to Power Broadcast Studio.

The single-panel RPC features the flexibility to work with a number of control platforms like DMX, HTTP, Telnet, sACN, RS-232, and BacNET. It offers features like circuit protection, power management, on/off control, and power sequencing. The RPC is programmed for three zones, consisting of the two studios and the control room. It provides protection from brownout as well as over- and under-voltage protection, sends notifications, and enables remote monitoring.

“The ability for broadcast teams to go live at any time depends on the seamless control and power protection of their AVL systems,” said LynTec president Mark Bishop. “The installation at Campbellsville University, under the guidance of JCA Media, illustrates how our RPC panel provides invaluable control and protection that improves the performance and lifespan of their AVL systems and fits right into any production workflow.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California District Breaks Ground on Major Campus Renovation

    Alameda Unified School District (AUSD) in Alameda, Calif., recently announced that construction has begun on a major campus overhaul for Otis Elementary School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates, Inc., for its design and construction, respectively.

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Clearing the Air: H2M Busts Common AC/HVAC Myths

    When it comes to keeping school facilities comfortable and energy-efficient, there’s no shortage of heating, ventilation, and air conditioning (HVAC) advice circulating online or from well-intentioned neighbors. There are also many myths surrounding the negative impact AC/HVAC systems can have on school buildings.