Gonzaga University Names New Integrated Science and Engineering Facility

Gonzaga University in Spokane, Wash., announced this week that it has named its new Integrated Science and Engineering facility: The John and Joan Bollier Family Center for Integrated Science and Engineering is scheduled to open this fall. The Bollier family, from Newberg, Ore., provided a significant donation for the construction of the $49.7-million facility.

“The Bollier family exemplifies the values, commitment, and spirit of this community. John, Joan, Brett, Emily, and Nolan’s thoughtful and generous leadership makes a significant difference in ensuring the University delivers on this mission,” said Gonzaga President Thayne M. McCulloh, D.Phil. “Because of the Bolliers, Gonzaga’s commitment to Jesuit STEM education and research will have an impact on the Inland Northwest and beyond for generations to come. I am truly thankful for the support and Zag spirit with which they show up each day.”

According to a press release, in September, faculty and staff will move into their offices and common areas, study spaces and labs will open to students. Classes are scheduled to begin in the spring 2022 semester. The 82,000-square-foot space will focus on STEM education at Gonzaga and place a special emphasis on cross-disciplinary collaboration. The building will feature skybridges connecting it to the PACCAR Center for Applied Science and to the College of Arts and Sciences’ chemistry and biology departments in Hughes Hall.

According to a brochure on the university website, the new facility will increase the university’s STEM space by 44% and add 18 new labs, including a Psych Suite, a math lab, an innovation lab, a circuits lab, technology and engineering labs, student project wet & dry labs, a dynamics & vibration lab, an innovation studio, and more.

The project’s lead architect is SRG Partnership Inc. of Portland, Ore., partnering with Integrus Architecture of Spokane, Wash.; Research Facilities Design of San Diego, Calif.; MW Engineers of Spokane; and DCI Engineers of Spokane.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.