La. Public Residential School Opens First Residence Hall

The Louisiana School for Math, Science and the Arts (LSMSA), a Blue-Ribbon boarding school for high-school students located in Natchitoches, La., opened its first on-campus residence hall this week. The 110,000-square-foot Living Learning Commons (LLC) will house 360 students from 41 of the state’s 64 parishes, according to local news. The school graduated its first class in 1985, but until now, the school has partnered with adjacent Northwestern State University to house students in two university facilities, Caddo Hall and Prudhomme Hall.

“They’re excited,” said LSMSA executive director Dr. Steve Horton. “I think the ones who lived in Caddo and Prudhomme are probably the most excited because they knew what they had before and what they’re moving to.”

LSMSA’s agreement with NSU was originally supposed to be temporary. The five-year agreement turned into more than 35 due to a lack of funding, according to a news release. The school broke ground on a residence hall of its own in 2019 thanks to $25 million from the State of Louisiana, according to a news release.

LSMSA Living Learning Commons
Photo Credit: Tipton Associates

The four-story facility is made up of three towers: Caddo for girls, Prudhomme for boys and Bossier as an overflow tower that will alternate each year. Amenities include a fully stocked kitchen, game room and a commons area on every floor. Changes from the previous living situation include a flat-rate student fee for laundry instead of coin-operated machines, as well as decreasing the occupancy of each suite area from six to four.

The LLC was jointly designed by Ashe Broussard Weinzettle and Tipton Associates. The general contractor was Ratliff Companies.

Horton took distinct pride in the school’s newfound independence. “We’re our own campus,” he said. “We are now just proudly adjacent to the Northwestern campus.”

He also credited the long-overdue construction to Governor John Bel Edwards. “They saw what the students were living in. I think they realized that the state owed this population what was promised to them 30 years ago and saw fit to find the money to fund this dream that’s been in place—and a plan that’s been in process—for a very long time,” said Horton.

LSMSA is a public, residential high school for students in grades 10–12.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

Digital Edition