Nebraska Town Breaks Ground on New High School

A groundbreaking ceremony was held this week for a new high school in Boys Town, Neb. The three-story, 110,000-square-foot facility will stand on the site of the small town’s previous high school, which was built in 1948 and was recently demolished to make room for construction. The project comes with a budget of $30 million and is currently scheduled for completion in August 2023.

“This school will serve as our incubator for educational concepts that we will teach to over 500 schools a year, including many right here in Nebraska,” said Father Steven Boes, Boys Town’s national executive director.

The facility will have the capacity for the district’s estimated 350 high-school students. About 80% of students arrive at the school with distinct academic deficiencies or behavior challenges, said a Boys Town spokeswoman, but 97% proceed to graduate from high school or continue their education.

According to local news sources, the village of Boys Town was founded in 1917 by the Rev. Edward J. Flanagan. Also known as “Father Flanagan’s Boys’ Home,” the town is dedicated to the treatment, care, and education of at-risk children.

“This new education center will help Boys Town continue to provide a safe and inspiring learning experience for our students,” said Boes. “We continue to make improvements on our campus as the needs of our children change.”

According to the Boys Town website, the Boys Town Education Center will feature amenities like science labs, state-of-the-art technology, adaptive indoor and outdoor classroom environments, a Maker’s Space, a multilevel media center, common spaces, a quiet gathering space for prayer and meditation, and centralized offices for administration and the behavioral intervention team.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.