Nebraska Town Breaks Ground on New High School

A groundbreaking ceremony was held this week for a new high school in Boys Town, Neb. The three-story, 110,000-square-foot facility will stand on the site of the small town’s previous high school, which was built in 1948 and was recently demolished to make room for construction. The project comes with a budget of $30 million and is currently scheduled for completion in August 2023.

“This school will serve as our incubator for educational concepts that we will teach to over 500 schools a year, including many right here in Nebraska,” said Father Steven Boes, Boys Town’s national executive director.

The facility will have the capacity for the district’s estimated 350 high-school students. About 80% of students arrive at the school with distinct academic deficiencies or behavior challenges, said a Boys Town spokeswoman, but 97% proceed to graduate from high school or continue their education.

According to local news sources, the village of Boys Town was founded in 1917 by the Rev. Edward J. Flanagan. Also known as “Father Flanagan’s Boys’ Home,” the town is dedicated to the treatment, care, and education of at-risk children.

“This new education center will help Boys Town continue to provide a safe and inspiring learning experience for our students,” said Boes. “We continue to make improvements on our campus as the needs of our children change.”

According to the Boys Town website, the Boys Town Education Center will feature amenities like science labs, state-of-the-art technology, adaptive indoor and outdoor classroom environments, a Maker’s Space, a multilevel media center, common spaces, a quiet gathering space for prayer and meditation, and centralized offices for administration and the behavioral intervention team.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • University of Pennsylvania Releases Design of Future Physical Sciences Building

    The University of Pennsylvania (Penn) in Philadelphia, Penn., recently released renderings of an upcoming 350,000-square-foot Physical Sciences Building, according to news release. The facility was designed by CO Architects and will unite the university’s departments of Physics and Astronomy, Mathematics, and Earth and Environmental Science.

  • Barbara Vick Western Branch

    Barbara Vick Western Branch

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Barbara Vick Western Branch has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.