Nebraska Town Breaks Ground on New High School

A groundbreaking ceremony was held this week for a new high school in Boys Town, Neb. The three-story, 110,000-square-foot facility will stand on the site of the small town’s previous high school, which was built in 1948 and was recently demolished to make room for construction. The project comes with a budget of $30 million and is currently scheduled for completion in August 2023.

“This school will serve as our incubator for educational concepts that we will teach to over 500 schools a year, including many right here in Nebraska,” said Father Steven Boes, Boys Town’s national executive director.

The facility will have the capacity for the district’s estimated 350 high-school students. About 80% of students arrive at the school with distinct academic deficiencies or behavior challenges, said a Boys Town spokeswoman, but 97% proceed to graduate from high school or continue their education.

According to local news sources, the village of Boys Town was founded in 1917 by the Rev. Edward J. Flanagan. Also known as “Father Flanagan’s Boys’ Home,” the town is dedicated to the treatment, care, and education of at-risk children.

“This new education center will help Boys Town continue to provide a safe and inspiring learning experience for our students,” said Boes. “We continue to make improvements on our campus as the needs of our children change.”

According to the Boys Town website, the Boys Town Education Center will feature amenities like science labs, state-of-the-art technology, adaptive indoor and outdoor classroom environments, a Maker’s Space, a multilevel media center, common spaces, a quiet gathering space for prayer and meditation, and centralized offices for administration and the behavioral intervention team.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • Delta State University Completes Renovations to School of Nursing Facilities

    Delta State University recently completed a major expansion and renovation project for the Robert E. Smith School of Nursing facilities on its campus in Cleveland, Miss., according to a news release. The project includes about 14,000 square feet of new construction and more than 21,000 square feet of renovation work to the existing space.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

Digital Edition