Orange Coast College Debuts $61.5M Academic Building

Orange Coast College in Costa Mesa, Calif., recently announced that construction is complete on a new, $61.5-million Language Arts and Social Science Building. The college partnered with C.W. Driver Companies on the facility, which measures in at three stories and 107,760 square feet. Amenities include classrooms and office space; conference rooms and support space; an ESL computer lab; pace for speech, theater and debate; and a journalism newsroom for the student newspaper.

The new facility replaces 60-year-old social sciences classrooms and the 50-year-old literature and languages building. Built with the goal of modernizing the campus and accommodating enrollment growth, the Language Arts and Social Science Building features indoor labs for psychology, economics, English, world languages and communication; indoor/outdoor labs for geography and anthropology; and storage space. The second floor features a skyway that connects the building to the adjacent Mathematics, Business and Computer Center Building.

Orange Coast College Language Arts and Social Science Building
Photo credit: PabloMasonPhotography

“With many of its original buildings dating back to the 1950s, Orange Coast College sought ground-up construction of a modern, tech-enabled facility that would bring faculty and students together from similar departments under one roof,” said Dave Amundson, project executive at C.W. Driver Companies. “The Language Arts and Social Science Building will serve nearly 25% of the campus enrollment, fostering a centralized community of learning while being adaptable to education needs for many years to come.”

According to a press release, the building was funded 50/50 by California State Proposition 51 and by Measure M, “a $698-million general obligation bond provided and supported by the local community to modernize education facilities for all universities within the Coast Community College District.”

The college also partnered with tBP Architecture for the new facility’s design.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).