Orange Coast College Debuts $61.5M Academic Building

Orange Coast College in Costa Mesa, Calif., recently announced that construction is complete on a new, $61.5-million Language Arts and Social Science Building. The college partnered with C.W. Driver Companies on the facility, which measures in at three stories and 107,760 square feet. Amenities include classrooms and office space; conference rooms and support space; an ESL computer lab; pace for speech, theater and debate; and a journalism newsroom for the student newspaper.

The new facility replaces 60-year-old social sciences classrooms and the 50-year-old literature and languages building. Built with the goal of modernizing the campus and accommodating enrollment growth, the Language Arts and Social Science Building features indoor labs for psychology, economics, English, world languages and communication; indoor/outdoor labs for geography and anthropology; and storage space. The second floor features a skyway that connects the building to the adjacent Mathematics, Business and Computer Center Building.

Orange Coast College Language Arts and Social Science Building
Photo credit: PabloMasonPhotography

“With many of its original buildings dating back to the 1950s, Orange Coast College sought ground-up construction of a modern, tech-enabled facility that would bring faculty and students together from similar departments under one roof,” said Dave Amundson, project executive at C.W. Driver Companies. “The Language Arts and Social Science Building will serve nearly 25% of the campus enrollment, fostering a centralized community of learning while being adaptable to education needs for many years to come.”

According to a press release, the building was funded 50/50 by California State Proposition 51 and by Measure M, “a $698-million general obligation bond provided and supported by the local community to modernize education facilities for all universities within the Coast Community College District.”

The college also partnered with tBP Architecture for the new facility’s design.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • Washington State District Breaks Ground on New Elementary School

    Cheney School District No. 360 in Spokane County, Wash., recently announced that construction has begun on a new elementary school, according to local news. The district held a groundbreaking ceremony on May 18 in Airway Heights for the yet-to-be-named school, which is scheduled to open in fall 2027.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.