Ecore, Spartan Surfaces Relaunch Popular Flooring Line

Ecore, a company that converts reclaimed materials into a variety of performances surfaces, announced this week that it is partnering with flooring sales and marketing company Spartan Surfaces to relaunch its popular ECOsurfaces product line. A press release notes that the goal of the collaboration is to re-establish commitment to the sustainability goals of the design community.

“ECOsurfaces has always been our environmental banner to the A&D community. This strategic collaboration reinforces our commitment to a circular business model and elevates our commitment to being a leader in creating floors that do MORE for both people and the planet,” said Bo Barber, Ecore’s executive vice president of sales and marketing. “The support of Spartan Surfaces, a major player in sales and marketing for the commercial flooring industry, puts significant momentum behind this already successful collection by making it more readily available to the A&D community.”

The ECOsurfaces portfolio is made up of six flooring product solutions:

  • The RX Collection was designed for healthcare, senior living areas and fitness facilities. The surfaces were crafted to reduce injuries sustained during slip-and-fall accidents while still providing sound dampening and comfort.
  • Aurora was designed for comfort and safety, featuring a polyurethane-coated, calendared-rubber wear layer bonded to a vulcanized composition rubber (VCR) backing.
  • ECOsilence serves as a flat, VCR underlayer to be placed under most floor finishes.
  • ECOsurfaces was designed for heavy-use, high-traffic commercial environments like schools, childcare and play zones, gyms, building entrances, offices and more. The surface is 3.2 mm thick and comes in more than 30 colors.
  • Origins features a design merging Ecore’s past and present. Cork added to the VCR opens up unlimited combinations of design and color.
  • The Wellness Collection is made up of rubber, vinyl and turf surfaces for a variety of fitness and therapeutic uses.

“Spartan Surfaces has enjoyed a long and successful partnership with Ecore and its products. Together, we have pioneered a greater environmental awareness in the commercial community,” said Sean Swanson, vice president of strategic growth at Spartan Surfaces. “The re-launch of ECOsurfaces not only strengthens this partnership, but it also will play right into our strengths of building relationships with the end user and design community. The ECOsurfaces brand will be a key product in our expansion plans across the U.S.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.