Indiana University Approves Design for 11-Story Medical Education Building

The Board of Trustees at Indiana University recently approved the design of a new Medical Education Building for the Indiana University School of Medicine in Indianapolis. The new facility will stand 11 stories tall, measure in at roughly 326,200 square feet and provide much-needed additional space for the instructional and research needs of various programs, according to a university news release.

The building will feature a three-story base with an eight-story tower above its southern quarter. The base will contain medical education facilities like support space, shell space for a research vivarium, classrooms, a medical library and collaborative learning spaces, as well as a central gathering space. The tower will contain three floors of faculty offices (floors 5–7) and three floors of flexible research space, as well as research support services and office space (floors 8­–10). The fourth and eleventh floors will serve as fully mechanical spaces that will provide mechanical services for the structure.

According to the news release, “The architecture expresses the unique character of Indiana University with its use of Indiana limestone and precast concrete accents. Along the first floor, warm brick accents will give scale to the building and acknowledge the use of brick on adjacent existing buildings.”

Local news reports that the new facility will be co-located with the Indianapolis Academic Health Center as part of a $1.6-billion development by IU Health in downtown Indianapolis.

The architectural design was developed by Browning Day and Perkins&Will. A university news story from 2020 reports that the project will cost an estimated $245 million, $75 million of which will be requested from the state of Indiana.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

Digital Edition