C.W. Driver Completes $38M Middle School Reconstruction

Builder C.W. Driver Companies recently announced the completion of a $38-million reconstruction project for Menifee Valley Middle School in Menifee, Calif. The project involved converting more than 71,000 square feet of the campus into a magnet school for visual and performing arts, including adding two new classroom buildings, restoring the Visual and Performing Arts Center, building an open-concept library and repairing locker rooms, according to a news release.

Workers converted a series of temporary portables into permanent classrooms and lab spaces to create an academic courtyard. New spaces include music and choir spaces and a renovated stage in the Visual and Performing Arts Center. The reconstructed campus also features outdoor learning areas and active learning spaces called Flex Labs.

Menifee Valley Middle School
Photo Courtesy of Zack Benson Photography

“By leveraging decades of K–12 construction experience, we were proud to deliver a cutting-edge campus that will serve the growing Menifee community both now and well into the future,” said Eric Metzger, project manager at C.W. Driver Companies. “The tactful modernization of Menifee Valley Middle School allows for the space to adapt as educational and enrollment needs evolve over time.”

Other academic-based renovations include large classroom windows for increased natural light and flexible configurations and collaboration spaces in the library. Athletic renovations include locker room updates like ADA upgrades, improvements to AV capabilities and adding a washer/dryer.

“We carefully considered and incorporated input from our school community during the planning and construction phases of the reconstruction,” said Dr. Jennifer Root, superintendent at Menifee Union School District. “The result is a beautiful, collective effort from which we will teach and encourage students to live out the district’s vision of 'Engaging Young Minds for Limitless Futures' for years to come.”

Menifee Valley Middle School also partnered with BakerNowicki Design Studio for the project’s design.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.