C.W. Driver Completes $38M Middle School Reconstruction

Builder C.W. Driver Companies recently announced the completion of a $38-million reconstruction project for Menifee Valley Middle School in Menifee, Calif. The project involved converting more than 71,000 square feet of the campus into a magnet school for visual and performing arts, including adding two new classroom buildings, restoring the Visual and Performing Arts Center, building an open-concept library and repairing locker rooms, according to a news release.

Workers converted a series of temporary portables into permanent classrooms and lab spaces to create an academic courtyard. New spaces include music and choir spaces and a renovated stage in the Visual and Performing Arts Center. The reconstructed campus also features outdoor learning areas and active learning spaces called Flex Labs.

Menifee Valley Middle School
Photo Courtesy of Zack Benson Photography

“By leveraging decades of K–12 construction experience, we were proud to deliver a cutting-edge campus that will serve the growing Menifee community both now and well into the future,” said Eric Metzger, project manager at C.W. Driver Companies. “The tactful modernization of Menifee Valley Middle School allows for the space to adapt as educational and enrollment needs evolve over time.”

Other academic-based renovations include large classroom windows for increased natural light and flexible configurations and collaboration spaces in the library. Athletic renovations include locker room updates like ADA upgrades, improvements to AV capabilities and adding a washer/dryer.

“We carefully considered and incorporated input from our school community during the planning and construction phases of the reconstruction,” said Dr. Jennifer Root, superintendent at Menifee Union School District. “The result is a beautiful, collective effort from which we will teach and encourage students to live out the district’s vision of 'Engaging Young Minds for Limitless Futures' for years to come.”

Menifee Valley Middle School also partnered with BakerNowicki Design Studio for the project’s design.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

  • Embry-Riddle Breaks Ground on New Office Building

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced that construction has begun on a new office building for its campus Research Park, according to a news release. The university partnered with Hoar Construction on the 34,740-square-foot Center for Aerospace Technology II (CAT II), which will be used for research and lab purposes.

Digital Edition