CU Denver Selects Design Firm for New STEM Building

The University of Colorado Denver recently selected architecture firm SmithGroup to design its new engineering, design and computing building. The project is one of the major elements of CU Denver’s 2030 Strategic Plan and will serve as the focal point of the university’s new downtown innovation district, according to a news release. It will provide research space for topics like artificial intelligence, robotics and cybersecurity in verticals like health, construction, urban planning, manufacturing and space.

“This is essential as technology is changing faster than ever, and industry is asking engineers to do new types of work that require increased creativity, teamwork, and collaboration across disciplines,” said Martin Dunn, Dean of the College of Engineering, Design and Computing.

SmithGroup will put on a series of town halls to involve the campus and larger community in the design process, as well as to share updates and get feedback. Construction is scheduled to begin later this year and finish before the beginning of the fall 2024 semester.

“SmithGroup is one of the nation’s leaders in the higher education space,” said CU Denver Campus Architect Jered Minter. “They demonstrated an overwhelming amount of direct experience designing higher education engineering laboratories and spaces throughout the country.”

SmithGroup will serve as the design architect, architect of record and the MEP engineer for the project. The university is also partnering with Martin/Martin Consulting Engineers for structural engineering and McCarthy Building Companies as the general contractor and construction manager.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.