CU Denver Selects Design Firm for New STEM Building

The University of Colorado Denver recently selected architecture firm SmithGroup to design its new engineering, design and computing building. The project is one of the major elements of CU Denver’s 2030 Strategic Plan and will serve as the focal point of the university’s new downtown innovation district, according to a news release. It will provide research space for topics like artificial intelligence, robotics and cybersecurity in verticals like health, construction, urban planning, manufacturing and space.

“This is essential as technology is changing faster than ever, and industry is asking engineers to do new types of work that require increased creativity, teamwork, and collaboration across disciplines,” said Martin Dunn, Dean of the College of Engineering, Design and Computing.

SmithGroup will put on a series of town halls to involve the campus and larger community in the design process, as well as to share updates and get feedback. Construction is scheduled to begin later this year and finish before the beginning of the fall 2024 semester.

“SmithGroup is one of the nation’s leaders in the higher education space,” said CU Denver Campus Architect Jered Minter. “They demonstrated an overwhelming amount of direct experience designing higher education engineering laboratories and spaces throughout the country.”

SmithGroup will serve as the design architect, architect of record and the MEP engineer for the project. The university is also partnering with Martin/Martin Consulting Engineers for structural engineering and McCarthy Building Companies as the general contractor and construction manager.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

  • Preparing for the Next Era of Healthcare Education, Innovation

    Across the country, public universities and community colleges are accelerating investments in healthcare education facilities as part of a broader strategy to address workforce shortages, modernize outdated infrastructure, and expand clinical training capacity. These projects, which are often located at the center of campus health and science districts, are no longer limited to traditional classrooms.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition