College of Charleston Begins Renovation Projects

The College of Charleston in Charleston, S.C., recently kicked off two campus renovation projects.

Craig Hall, which contains the Admissions Visitor Center and Office of Admissions, will receive a series of mechanical renovations, according to university news. Admissions services will move to another campus building for the duration, and Craig Hall is scheduled to reopen before the beginning of the 2022–23 academic year.

Renovations to the first floor of the Marlene and Nathan Addlestone Library are also underway. Additions are slated to include more collaborative space for students, an expanded access and instruction desk in support of student and faculty research, two podcast studios and a permanent exhibition featuring items from the John M. Rivers Communications Museum.

University news reports that the library will remain open during all phases of renovation and that the major phases of construction work are scheduled during the college’s summer and winter breaks.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • abstract representation of hybrid learning environment

    The Permanence of Change: Why Hybrid Is the New Baseline

    Hybrid learning is here to stay, and it's reshaping how campus spaces function.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition