Sharp NEC Display Solutions Debuts New LCD Laser Projectors

Sharp NEC Display Solutions, which provides projectors and displays to a worldwide market, recently announced the addition of two new LCD laser projectors to its PE Series. The PE506UL and PE506WL were designed for use in K–12, higher education and corporate spaces and provide high-resolution images at a brightness of 5,200 lumens, according to a news release.

Sharp NEC Display Solutions PE506UL
The Sharp NEC Display Solutions PE506UL

“To meet the ever-changing needs of our customers, we’ve upgraded our PE Series entry-installation laser projector lineup with brighter, more flexible solutions for projector replacements or new installations. The upgraded PE Series projectors are among the smallest and lightest 5,000-lumen projectors in the market and include advanced features ideal for socially distanced classrooms, large lecture halls or even corporate environments,” said Ryan Pitterle, Product Manager, Sharp NEC Display Solutions. “The PE506UL and PE506WL are perfect for the cost-conscious customer looking to make the lamp-to-laser transition.”

The news release states that the PE506UL offers WUXGA 1920x1200 resolution and the PE506WL offers WXGA 1280x800 resolution. The light source offers a minimum of 20,000 hours of life to reduce both maintenance requirements and total cost of ownership. The LCD technology offers clear and dynamic images, bright colors, and both manual horizontal and vertical lens shift for ease of installation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition