Sharp NEC Display Solutions Debuts New LCD Laser Projectors

Sharp NEC Display Solutions, which provides projectors and displays to a worldwide market, recently announced the addition of two new LCD laser projectors to its PE Series. The PE506UL and PE506WL were designed for use in K–12, higher education and corporate spaces and provide high-resolution images at a brightness of 5,200 lumens, according to a news release.

Sharp NEC Display Solutions PE506UL
The Sharp NEC Display Solutions PE506UL

“To meet the ever-changing needs of our customers, we’ve upgraded our PE Series entry-installation laser projector lineup with brighter, more flexible solutions for projector replacements or new installations. The upgraded PE Series projectors are among the smallest and lightest 5,000-lumen projectors in the market and include advanced features ideal for socially distanced classrooms, large lecture halls or even corporate environments,” said Ryan Pitterle, Product Manager, Sharp NEC Display Solutions. “The PE506UL and PE506WL are perfect for the cost-conscious customer looking to make the lamp-to-laser transition.”

The news release states that the PE506UL offers WUXGA 1920x1200 resolution and the PE506WL offers WXGA 1280x800 resolution. The light source offers a minimum of 20,000 hours of life to reduce both maintenance requirements and total cost of ownership. The LCD technology offers clear and dynamic images, bright colors, and both manual horizontal and vertical lens shift for ease of installation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.