North Dakota School Board Approves New $94.5M High School

The Mandan School Board in Mandan, N.D., recently approved the construction of a new, $94.5-million high school. The new Mandan High School is set to replace the existing facility of the same name, which is scheduled for demolition once students transition to the new space. Construction by Northwest Contracting is scheduled to begin soon and finish in time for the beginning of the 2024–25 academic year, according to local news.

Funding for the project comes from an $84-million bond referendum that voters approved in April 2021. The referendum was for the construction of a new high school and a new elementary school in the nearby Lakewood area. Local news reports that construction on the new Lakewood Elementary is underway and is scheduled for completion in fall 2023. Additional funds will come from multiple sources like a successful Career & Technical Education (CTE) grant; the sale of property surrounding the two new schools; and various sponsorship opportunities and public-private partnerships.

“While the cost of the buildings has increased substantially over the last year, due to inflation, taxpayers can still expect to pay the $99.00 per $100,000 of property they own,” said Sheldon Wolf, Mandan School Board President. “This was the estimate that was shared by school officials during the school referendum informational meetings last year.”

Rising construction costs and funding limits have caused a few projects that were part of the original plan to be put on hold—such as a new swimming pool attached to the high school. The district said that the pool has already been designed and can be added when funds become available.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.