Chapman University Debuts New Hall of Engineering

Chapman University in Orange, Calif., recently opened a new home for its engineering school. The Swenson Family Hall of Engineering was created through a 31,000-square-foot interior build-out of the university’s existing Keck Center for Science and Engineering. The new wing occupies three floors and features amenities like research and teaching labs, a makerspace and robotics lab, and more. Both the Swenson Family Hall of Engineering and the Keck Center were built by C.W. Driver Companies.

“We were honored to partner with Chapman University in constructing a both beautiful and highly functional hall for its newest academic program, the Fowler School of Engineering,” said Aimee Siemianowski, project executive with C.W. Driver Companies. “Our long history of constructing higher education and research facilities for Chapman University and colleges across the state enabled us to deliver a cutting-edge facility designed to foster collaboration, reconfiguration and blur the lines between teaching and education.”

Swenson Family Hall of Engineering
Photo credit: Lawrence Anderson

The new wing’s first level serves as a collaborative student space and features a large gallery that connects to the rest of the Keck Center. The second floor includes research pods, teaching labs and study alcoves, while the third features a faculty suite that includes workspaces, meeting space and collaboration zones. The facility is named after Jim Swenson and the Swenson Family Foundation, which previously contributed $5 million to Chapman University.

“The opening of the Keck Center’s science wing in 2018 signaled a tremendous step forward in the STEM fields at Chapman University,” said Collette Creppell, vice president of campus planning and design at Chapman University. “Thanks to the valuable expertise of C.W. Driver Companies in building the Swenson Family Hall of Engineering, our new Fowler School of Engineering has a place to call its own. The facility will be paramount to attracting high-quality faculty and talented students pursuing undergraduate and graduate-level study of engineering, which in turn will help meet the growing demands of the California economy.”

The university and C.W. Driver Companies also partnered with AC Martin Partners, Inc. for the facility’s design.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.