Bucknell University to Build New Residence Halls

Bucknell University in Lewisburg, Pa., recently announced that it will build four apartment-style residence halls over the next two years. The new housing facilities will replace an existing complex of residential units known as “The Mods,” which are more than 50 years old. A press release reports that each unit will have space for 70 beds for a total capacity of 280 students.

The new residence halls will stand three stories and feature the university’s traditional red-brick exterior. They will feature apartments of various sizes with shared kitchen and bath spaces, and each residence hall will have four student lounge areas and laundry facilities. The new dorms’ design will also include geothermal heating and cooling systems.

“These new, apartment-style residence halls should provide students a substantial upgrade from ‘The Mods,’ which are in need of replacement,” said Fritz Family Dean of Students Amy Badal. “Based on student feedback, we have made a greater commitment to outdoor recreation options for students on campus, and the amenities found at these new student housing units represent a model for what we envision across campus moving forward.”

Bucknell West Residence Hall
Rendering courtesy of Gensler

According to the news release, half of “The Mods” will be demolished after the end of the fall 2022 semester, and the first two residence halls are scheduled to open at the beginning of fall 2023. The other half of the old facility will be replaced with the second pair of new buildings in time for the fall 2024 semester. The university will make alternate on-campus housing arrangements for students displaced by the demolition and construction. They will also feature modular elements that will reportedly shorten the construction schedule by about a year.

The four new buildings will also form the borders of an outdoor recreation area scheduled to feature an amphitheater, fire pit, volleyball court and ping pong tables, grills and additional seating.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • New Jersey Day School Opens New Science & Entrepreneurship Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently celebrated the grand opening of the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIG Architecture on the 32,000 square foot facility, completed on a 17-month construction timeline in time for the beginning of the new school year.

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.